Lynwood, CA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Rule
No condition causing accelerated erosion allowed
Design storm
Runoff controls sized for 10-year storm
Winter window
Oct 15 to Apr 15 extra restrictions
Enforced by
Director of Public Works
Appeal
To the Planning Commission

Summary

In the City of Lynwood, anyone grading, clearing land or building within the city must control accelerated erosion under Lynwood Municipal Code § 25-93-3, and the Director of Public Works can order a cited site to obtain an approved soil erosion and sediment control plan before work continues.

This article requires control of all existing and potential conditions of human induced accelerated erosion within all areas of the city. ... ... A. No person shall cause or allow the continued existence of a condition on any site that is causing or is likely to cause accelerated erosion as determined by the director of public works. B. Upon citation by the director of public works, the responsible person, shall take all appropriate measures to control erosion on the site specified in the notification within the period of time determined by the director of public works. C. The director of public works may require that a property owner whose property has been cited in accordance with subsection B of this section file and obtain approval of a soil erosion and sediment control plan and/or permit in accordance with section 25-93-5 of this article.

Full Breakdown

Article 93 of the zoning code requires control of every existing and potential source of human-caused accelerated erosion citywide, covering project planning, erosion control plans, runoff control, land clearing and winter grading under § 25-93-2. Section 25-93-3 makes it unlawful for anyone to cause or allow a condition on a site that is causing or is likely to cause accelerated erosion, as determined by the Director of Public Works; once the Director cites a property, the responsible party must control the erosion within the deadline set and may be ordered to file a soil erosion and sediment control plan and permit under § 25-93-5.

Runoff-control measures required under § 25-93-6 must be designed and maintained to handle a 10-year storm, with on-site retention required where soils percolate faster than two inches per hour unless the Director waives it for groundwater or slope-stability reasons. Land clearing and grading between October 15 and April 15, the city's winter operations period, faces extra restrictions under § 25-93-8: clearing more than one acre or grading more than 1,000 cubic yards during that window needs the Director's advance authorization, and every winter-period development permit must carry a printed notice warning that additional erosion control measures may be required.

Vegetation removal in that window cannot precede grading or construction by more than fifteen days, and erosion controls must stay in place every day work occurs on the site. A property owner who disagrees with a Director's citation, plan requirement or enforcement order can appeal to the Planning Commission under § 25-93-14.

Violations & Fines

Failing to control a cited erosion condition, clearing or grading without an approved soil erosion and sediment control plan, or grading during the October 15 to April 15 winter period without the Director of Public Works' authorization violates Article 93; the Director can stop work, require corrective plans and additional control measures, and issued permits remain conditioned on compliance for the life of the project.

Frequently Asked Questions

Does Lynwood require an erosion control plan for construction?
Yes, when the Director of Public Works determines erosion can reasonably be expected. Section 25-93-5 requires an approved soil erosion and sediment control plan before the city issues a building, grading or erosion control permit for a project likely to disturb soil.
What happens if a property is cited for erosion?
Under § 25-93-3 the responsible party must take all appropriate measures to control the erosion within the timeframe the Director of Public Works sets in the citation, and the Director can also require the owner to obtain an approved erosion control plan or permit.
Are there extra rules for grading in winter?
Yes. Between October 15 and April 15, § 25-93-8 requires the Director's advance authorization for clearing over one acre or grading over 1,000 cubic yards, extra soil protection measures, and a printed notice on every permit warning that added controls may apply.

Sources & Official References

Other rules in Lynwood

All Lynwood rules

California rules heatmap·Compare Lynwood to another location·View the California environmental rules overview

Get notified when Erosion Control in Lynwood, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Los Angeles County handle erosion control.

Carson, CA
Some Restrictions
West Covina, CA
Some Restrictions
El Monte, CA
Some Restrictions
Inglewood, CA
Some Restrictions
Santa Monica, CA
Some Restrictions
South Gate, CA
Some Restrictions
Santa Clarita, CA
Some Restrictions
Palmdale, CA
Some Restrictions