Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Standard lowest-floor rule
elevated to or above base flood elevation
AR/AR-AH/AR-AO zones
FIRM depth number, or 2 feet minimum
Certification required from
registered engineer/surveyor or building inspector
Enclosure vent standard
1 sq in per sq ft, openings 1 foot above grade
Violation
misdemeanor under § 15-8

Summary

In the City of Lynwood, new construction and substantial improvements in a special flood hazard area must have the lowest floor, including any basement, elevated to or above the base flood elevation, with elevation certified by a registered engineer, surveyor, or the city building inspector.

1. New construction and substantial improvement of any structure shall have the lowest floor, including basement, elevated to or above the base flood elevation. Nonresidential structures may meet the standards in subsection c3 of this Section. Upon the completion of the structure the elevation of the lowest floor including basement shall be certified by a registered professional engineer or surveyor, or verified by the community Building Inspector to be properly elevated. Such certification shall be provided to the Floodplain Administrator. ... 2. New construction and substantial improvements of any structure in Zone AR, AR/AH, or AR/AO shall have the lowest floor, including basement, elevated above the highest adjacent grade at least as high as the depth number specified in feet on the FIRM, or at least two feet (2') if no depth number is specified.

Full Breakdown

Lynwood Municipal Code Section 15-14 sets the construction standards that apply throughout the city's mapped special flood hazard areas. Under subsection c1, new construction and substantial improvements must have the lowest floor, including any basement, elevated to or above the base flood elevation, the water-surface height reached by the flood having a one percent annual chance of occurring (the '100-year flood,' defined in Section 15-5). Nonresidential structures may instead meet the floodproofing alternative in subsection c3, making the structure watertight below the base flood level with walls substantially impermeable to water and components able to resist hydrostatic and hydrodynamic loads, certified by a registered engineer or architect.

In Zone AR, AR/AH, or AR/AO, subsection c2 requires the lowest floor elevated above the highest adjacent grade to at least the depth number shown on the FIRM, or at least two feet if the FIRM lists no depth number. Whichever standard applies, the finished elevation must be certified by a registered professional engineer or surveyor, or verified by the city's building inspector, and that certification goes to the Floodplain Administrator. Subsection c4 additionally requires enclosed areas below the lowest floor that can flood to have at least two openings with a combined net area of one square inch per square foot of enclosed space, with opening bottoms no higher than one foot above grade, so floodwater can enter and exit and equalize hydrostatic pressure on the walls.

Violations & Fines

Constructing or altering a structure in a special flood hazard area without meeting the elevation, floodproofing, or certification requirements of Section 15-14 violates Chapter 15 and is a misdemeanor under Section 15-8, and the City Council may take further lawful action to remedy the violation.

Frequently Asked Questions

How high must my lowest floor be built in a Lynwood flood zone?
Section 15-14c1 requires the lowest floor, including any basement, to be elevated to or above the base flood elevation, the 100-year flood level, and the finished elevation must be certified by a registered engineer, surveyor, or the city building inspector.
Is there a different rule for AR flood zones?
Yes. Section 15-14c2 requires structures in Zone AR, AR/AH, or AR/AO to be elevated above the highest adjacent grade to the depth number shown on the FIRM, or at least two feet if the map lists no depth number.
Can a commercial building be floodproofed instead of elevated?
Yes. Section 15-14c3 lets nonresidential structures be floodproofed watertight below the base flood level with walls resistant to water and structural components able to resist flood loads, certified by a registered engineer or architect instead of physically elevating the building.

Sources & Official References

Other rules in Lynwood

All Lynwood rules

California rules heatmap·Compare Lynwood to another location·View the California environmental rules overview

Get notified when Flood Elevation Requirements in Lynwood, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Elevation Requirements in Nearby Cities

How other cities in Los Angeles County handle flood elevation requirements.

West Covina, CA
Some Restrictions
Norwalk, CA
Some Restrictions
Carson, CA
Some Restrictions
South Gate, CA
Some Restrictions
Los Angeles, CA
Some Restrictions
Pasadena, CA
Some Restrictions
Palmdale, CA
Some Restrictions
Lakewood, CA
Some Restrictions