Plantation, FL Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified July 2026

Key Facts

Construction sites
BMPs required during and after work
Site plans
Reviewed by director before work starts
Waterfront duty
Stabilized shoreline or seawall required
Cure period
90 days from notice of violation
Dredging
Dust and sedimentation plan pre-approved

Summary

Plantation's erosion rules run through its stormwater and waterway sections rather than a slope ordinance. Construction sites must maintain best management practices to cut sediment in runoff, and canal-front owners must keep a stabilized shoreline or seawall.

Manage filling, grading, dredging, mining, paving, excavation, drilling operations, storage of equipment or materials, and other development which may increase flood damage or erosion potential

Source: City of Plantation Code of Ordinances (Municode)View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 30 Update 1).

Full Breakdown

Section 9-79(a) requires construction sites to maintain structural and non-structural best management practices during and after construction, excavation or alteration to reduce pollutants and sediment in stormwater runoff. Site plans must be reviewed by the director before work starts and must describe the structures, procedures or control measures used to control sediment loadings, with inspections built into the permit. On the waterways, Section 15-24 makes it unlawful to let a canal shallow beyond the degree common to adjacent property by failing to build or maintain a stabilized shoreline or seawall; you get 90 days from a notice of violation to restore the grade. Dredging jobs must submit dust and sedimentation control measures for approval first.

Violations & Fines

Failing to stabilize a shoreline within 90 days of notice is declared a nuisance; the city may do the work itself and specially assess the responsible property owner for the costs.

Frequently Asked Questions

Do I need erosion control for a project in Plantation?
If you are building, excavating or altering a site, Section 9-79(a) requires best management practices to reduce sediment in runoff, and your site plan must describe those control measures before work begins.
What if my canal bank is washing away?
Section 15-24 requires you to build or maintain a stabilized shoreline or seawall. After a notice of violation you have 90 days to restore the waterway to original design grade.

Sources & Official References

Other rules in Plantation

All Plantation rules

Florida rules heatmap·Compare Plantation to another location·View the Florida environmental rules overview

Get notified when Erosion Control in Plantation, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Broward County handle erosion control.

Hollywood, FL
Some Restrictions
Pembroke Pines, FL
Some Restrictions
Pompano Beach, FL
Some Restrictions