Redondo Beach, CA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

CDP application
Erosion control plans reviewed by City Engineer
Citywide standard
Chapter 7, Title 5 stormwater regulations
SUSMP threshold
1 acre disturbed or 10,000 sq ft impervious
Permit checkpoint
NPDES proof required before grading/building permits
Penalty
Up to $1,000 fine or 6 months, per day
Enforcement tool
Public nuisance abatement, cease-and-desist orders

Summary

Redondo Beach requires drainage and erosion control plans approved by the City Engineer before it will process a Coastal Development Permit, and it ties grading, building, and occupancy permits citywide to compliance with the Stormwater and Urban Runoff Pollution Control Regulations enforced under the regional NPDES permit.

Contents of application. ... In addition to the application and fee, a site plan, floor plan, and elevations of the project drawn to scale and dimensioned shall be submitted which include the following information as applicable... ... (18) Drainage and erosion control plans reviewed and approved by the City Engineer pursuant to Chapter 7 of Title 5 of the Redondo Beach Municipal Code;

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4889554; v14 updated 2026-05-12).

Full Breakdown

2210(b)(18) must include drainage and erosion control plans reviewed and approved by the City Engineer pursuant to Chapter 7 of Title 5, the city's Stormwater and Urban Runoff Pollution Control Regulations. 14 of Title 9 extends that standard citywide: all development must conform to the stormwater standards of the State of California as implemented through Chapter 7 of Title 5, and site design must minimize impervious surfaces and keep setback areas permeable where feasible. 112(a) backs this with a permitting checkpoint, requiring proof of compliance with the applicable NPDES permit and the city's development construction program, in a form acceptable to the Engineer, before any grading, building, or occupancy permit is issued.

113 must also prepare a Standard Urban Stormwater Mitigation Plan with low-impact-development measures such as infiltration, bioretention, and rainfall harvest, reviewed by the Engineer before any discretionary permit or certificate of occupancy issues. New single-family hillside homes carry added duties: conserving natural areas, protecting slopes and channels, and diverting roof and surface runoff to vegetated areas unless that would destabilize a slope. 09, with separate fees for retaining walls or major drainage structures.

Violations & Fines

Section 5-7.114 lets the City Engineer declare an erosion or drainage violation, or a failure to follow an approved stormwater mitigation plan, a public nuisance subject to abatement at the owner's expense, cease-and-desist orders, and civil actions seeking injunctions, cost recovery, and compensatory damages. Violations are also punishable as misdemeanors under Section 1-2.01, up to a $1,000 fine or six months in jail under Section 1-2.02, each day counted separately, and can trigger revocation of the related permit.

Frequently Asked Questions

Does Redondo Beach require an erosion control plan for coastal construction?
Yes. Section 10-5.2210(b)(18) requires every Coastal Development Permit application to include drainage and erosion control plans reviewed and approved by the City Engineer under the city's Stormwater and Urban Runoff Pollution Control Regulations before the application is processed.
Do erosion and runoff rules apply outside the coastal zone?
Yes, Section 9-1.14 applies the same Chapter 7, Title 5 stormwater standards to all development citywide, and Section 5-7.112 requires proof of NPDES compliance before the city issues any grading, building, or occupancy permit.
What triggers a full Stormwater Mitigation Plan?
Section 5-7.113 requires a SUSMP for new development disturbing one acre or adding 10,000 square feet of impervious surface, plus lower thresholds for parking lots, gas stations, restaurants, and hillside homes, with low-impact-development BMPs reviewed by the City Engineer.
What happens if erosion control measures fail during construction?
The Engineer can declare the condition a public nuisance under Section 5-7.114, order abatement at the owner's expense, issue a cease-and-desist order, and pursue civil penalties or permit revocation on top of the misdemeanor penalties in Section 1-2.01.

Sources & Official References

Other rules in Redondo Beach

All Redondo Beach rules

California rules heatmap·Compare Redondo Beach to another location·View the California environmental rules overview

Get notified when Erosion Control in Redondo Beach, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Los Angeles County handle erosion control.

Carson, CA
Some Restrictions
West Covina, CA
Some Restrictions
El Monte, CA
Some Restrictions
Inglewood, CA
Some Restrictions
Santa Monica, CA
Some Restrictions
South Gate, CA
Some Restrictions
Santa Clarita, CA
Some Restrictions
Palmdale, CA
Some Restrictions