Redondo Beach, CA Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Freeboard above BFE
- 2 feet, residential lowest floor
- AO zone alternative
- 2 ft above FIRM depth, or 4 ft minimum
- Certification required
- Registered civil engineer or surveyor
- Nonresidential alternative
- Dry floodproofing per (c)(2)
- Governing chapter
- RBMC Title 9, Chapter 12
Summary
New residential construction and substantial improvements in a mapped flood hazard zone must have the lowest floor, including any basement, elevated two feet above the base flood elevation under RBMC Section 9-12.501, verified by a licensed engineer or surveyor.
Residential construction. All new construction or substantial improvements of residential structures shall have the lowest floor, including basement: a. In AE, AH, A1-30 Zones, elevated two feet above the base flood elevation. b. In an AO zone, elevated above the highest adjacent grade to a height two feet above the depth number specified in feet on the FIRM, or elevated at least four feet above the highest adjacent grade if no depth number is specified. c. In an A zone, without BFEs specified on the FIRM [unnumbered A zone], elevated 2 feet above the base flood elevation; as determined under Section 9-12.402(c) of this chapter. Upon the completion of the structure, the elevation of the lowest floor, including basement, shall be certified by a registered civil engineer or licensed land surveyor, and verified by the community building inspector to be properly elevated.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4889554; v14 updated 2026-05-12).
Full Breakdown
501(c)(1), part of the Flood Damage Prevention chapter's Article 5 construction standards, sets the freeboard the city requires above FEMA's base flood elevation (BFE). In Zones AE, AH, and A1-30, new residential construction or substantial improvements must have the lowest floor, including any basement, elevated two feet above the BFE. In an AO zone, the lowest floor must be elevated above the highest adjacent grade to a height two feet above the depth number shown on the Flood Insurance Rate Map, or at least four feet above the highest adjacent grade if no depth number is specified.
402(c). Once construction is complete, the elevation of the lowest floor must be certified by a registered civil engineer or licensed land surveyor and verified by the community building inspector before that certification is provided to the Floodplain Administrator. 501(c)(2): they may either meet the same elevation standard or be dry-floodproofed with watertight, substantially impermeable walls, structural components able to resist hydrostatic and hydrodynamic loads, and certification from a registered civil engineer or architect. 501(c)(3).
Violations & Fines
Building or substantially improving a structure below the required two-foot freeboard elevation, or without the required engineer or surveyor elevation certification, is a misdemeanor under RBMC Section 9-12.303, and the City may deny the certificate of occupancy or condition it on corrective elevation work by the Floodplain Administrator.
Frequently Asked Questions
How high above base flood elevation must a Redondo Beach home be built?
Who certifies the required flood elevation once construction is done?
Can a nonresidential building skip the elevation requirement?
Sources & Official References
Other rules in Redondo Beach
California rules heatmap·Compare Redondo Beach to another location·View the California environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Flood Elevation Requirements in Nearby Cities
How other cities in Los Angeles County handle flood elevation requirements.