San Clemente, CA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Rainy season
October 15 to April 15
Grading trigger
Over 200 cubic yards needs approved erosion control
Compaction standard
Desilting basins compacted to 90% relative density
Plan deadline
Erosion control plans due by September 15 yearly
Enforcing official
City Engineer

Summary

San Clemente's Grading Ordinance requires erosion and sediment control on every active grading site during the rainy season, October 15 through April 15, under Municipal Code Section 15.36.320. Sites moving more than 200 cubic yards in that window need an approved or waived erosion control system before work continues, and the City Engineer oversees desilting basins, planting and stormwater compliance.

B ... Where necessary, temporary and/or permanent erosion control devices such as desilting basins, check dams, riprap or other devices or methods, as approved by the City Engineer, shall be employed to control erosion and provide safety during the rainy season from October 15th to April 15th.C ... No grading work in excess of two hundred (200) cubic yards will be allowed between October 15th and April 15th on any single grading site under permit unless an erosion control system has been approved or waived by the City Engineer.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Traffic: Supplement 30 | Code of Ordinances: Supplement 66 Update 1).

Full Breakdown

Article XII of the city's Grading Ordinance, Chapter 15.36, governs erosion control on every graded site. Section 15.36.320 requires the faces of cut and fill slopes, and the project site generally, to be prepared and maintained against erosion, with the City Engineer able to waive protection only where the cut material itself resists erosion. During the rainy season, defined in the section as October 15th through April 15th, temporary or permanent erosion control devices, desilting basins, check dams or riprap must be employed as the City Engineer approves, and no single permitted grading site may move more than 200 cubic yards of material during that window unless an erosion control system has been approved or waived.

The section also sets specific engineering standards: desilting basins must provide capacity meeting current Orange County Environment Management Agency standards, and where built of compacted earth must reach 90 percent relative compaction, verified by a soil engineering report submitted to the City Engineer. Slopes over five feet high need effective planting unless the City Engineer approves otherwise, and slopes over fifteen feet may need a sprinkler system. Removable protective devices must be in place at the end of each working day whenever the five-day rain forecast exceeds a 40 percent probability. Section 15.36.330 requires an erosion control plan submitted for City Engineer approval by September 15th each year for permitted projects, though single-lot residential projects can skip the plan if an approved system is installed before October 15th. Any violation of a state or federal stormwater permit, or of the city's own water quality requirements under Chapter 13.40, is separately a violation of this article.

Violations & Fines

Under Section 15.36.340(F), if the contractor or owner fails to maintain the required erosion control devices during the rainy season, the City Engineer can perform emergency maintenance at the owner's expense and revoke the grading permit outright; the permit cannot be renewed until an approved erosion control system is installed and the owner pays half the original permit fee.

Frequently Asked Questions

When does San Clemente require erosion control on a grading site?
Erosion control devices are required during the rainy season, defined in Section 15.36.320 as October 15th through April 15th, and no grading site under permit may move more than 200 cubic yards of material during that window unless an erosion control system has been approved or waived by the City Engineer.
What happens if I don't maintain my erosion control devices?
Under Section 15.36.340(F), the City Engineer can perform emergency maintenance at the property owner's expense and revoke the grading permit; it will not be renewed until an approved system is installed and the owner pays half the original permit fee.
Is there a deadline to submit an erosion control plan?
Yes. Section 15.36.330 requires erosion control plans to be submitted to the City Engineer for approval by September 15th each year for projects under a grading permit, though the plan can be waived for single residential lots with an approved system installed before October 15th.

Sources & Official References

Other rules in San Clemente

All San Clemente rules

California rules heatmap·Compare San Clemente to another location·View the California environmental rules overview

Get notified when Erosion Control in San Clemente, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Orange County handle erosion control.

Santa Ana, CA
Some Restrictions
Fullerton, CA
Some Restrictions
Huntington Beach, CA
Some Restrictions
Orange, CA
Some Restrictions
Newport Beach, CA
Some Restrictions
Mission Viejo, CA
Some Restrictions
Costa Mesa, CA
Some Restrictions
Anaheim, CA
Some Restrictions