Key Facts

Rainy season control window
October 15 to April 15
Slope planting trigger
Slopes over 7 feet need irrigation
Terrace drain capacity limit
13,500 sq ft per drain run
Terrace drain paving standard
3-inch reinforced concrete, 6% grade
Enforcing office
Community Development / City Official
General penalty
Up to $1,000 fine or 6 months jail

Summary

In the City of Yorba Linda, every cut and fill slope created during grading must be prepared and maintained against erosion, with effective planting installed before the City Official signs off on final approval. Chapter 15.40 of the Yorba Linda Municipal Code also requires desilting basins, check dams, cribbing or riprap on hillside sites during the rainy season, October 15 through April 15.

B. Erosion Control—Slopes. The faces of cut and fill slopes shall be prepared and maintained to control against erosion. This control may consist of effective planting. The protection for the slopes shall be installed as soon as practicable and prior to calling for final approval. Where cut slopes are not subject to erosion due to the erosion-resistant character of the materials, such protection may be omitted by special approval of the City Official. C. Other Devices. Where necessary, desilting basin, check dams, cribbing, riprap or other devices or methods as approved by the City Official shall be employed to control erosion and provide safety during the rainy season, from October 15th to April 15th.

Full Breakdown

Section 15.40.090 of the Yorba Linda Municipal Code, part of the City's grading chapter, sets the erosion-control rules that apply to every cut or fill slope regulated under a grading permit. Subsection B requires the faces of cut and fill slopes to be prepared and maintained to control against erosion, and specifies that effective planting can satisfy that duty; the protection has to go in as soon as practicable and before the applicant calls for final approval. The City Official can waive the planting requirement only where the cut material itself resists erosion.

Subsection C adds a second layer for the rainy season, October 15th through April 15th, when the City Official may require desilting basins, check dams, cribbing, riprap or other approved devices to control erosion and protect the site. These requirements sit inside a broader slope-protection scheme: Section 15.40.100 requires permanent, full-coverage irrigation on any slope over seven feet in height, plant material sized to prevent soil slippage, and a landscape architect's certification to the City Official before the project can get a certificate of occupancy.

Section 15.40.090 also sets numeric drainage-terrace standards: a minimum six-percent grade, three-inch reinforced concrete paving, and a thirteen-thousand-five-hundred-square-foot limit on the area a single terrace drain can serve before it must discharge into a downdrain. Community Development inspects at the pregrading, toe, excavation, fill, drainage-device, rough-grading and final stages under Section 15.40.160, and Section 15.40.170 lets the City Official halt all work immediately if erosion or drainage conditions do not match the approved plan, barring resumption until a revised grading plan is approved.

Violations & Fines

Grading without approved erosion control, or continuing work after a stop-work order under Section 15.40.170, is a code violation. Because Chapter 15.40 sets no dedicated penalty, Section 1.12.010's general penalty applies: a fine up to $1,000, up to six months in jail, or both, with the City Attorney able to charge it as an infraction instead, and each day a violation continues counted as a separate offense.

Frequently Asked Questions

Does Yorba Linda require erosion control during grading?
Yes. Municipal Code Section 15.40.090 requires the faces of every cut and fill slope to be prepared and maintained against erosion, through effective planting installed before final grading approval. During the rainy season, October 15 through April 15, the City Official can also require desilting basins, check dams, cribbing or riprap on the site to keep sediment from washing off the hillside.
Do slopes need permanent irrigation after grading?
Slopes taller than seven feet, measured vertically, need permanent, full-coverage irrigation under Section 15.40.100, sized to sustain the plantings and protect against fire hazard. A licensed landscape architect must supervise the plant and irrigation plans, and must certify the completed work to the City Official before the City issues a certificate of use or occupancy for the subdivision.
What happens if erosion control is not installed?
The City Official can refuse to approve further grading work under Section 15.40.170 and order an immediate stop-work order until the site is brought back into compliance. Because the grading chapter carries no specific fine, Section 1.12.010's general penalty applies, up to a $1,000 fine, six months in jail, or both, with each day of continued violation a separate offense.

Sources & Official References

Other rules in Yorba Linda

All Yorba Linda rules

California rules heatmap·Compare Yorba Linda to another location·View the California environmental rules overview

Get notified when Erosion Control in Yorba Linda, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Orange County handle erosion control.

Santa Ana, CA
Some Restrictions
Fullerton, CA
Some Restrictions
Huntington Beach, CA
Some Restrictions
Orange, CA
Some Restrictions
Newport Beach, CA
Some Restrictions
Mission Viejo, CA
Some Restrictions
Costa Mesa, CA
Some Restrictions
Anaheim, CA
Some Restrictions