Key Facts
- Freeboard margin
- 2 feet above regional flood level
- AO/AH lowest floor
- highest of 3 elevation tests
- Administering official
- City of Beloit Zoning Officer
- Enforcement
- public nuisance action, Wis. Stat. § 87.30
- Statutory authority
- Wis. Stat. §§ 62.23, 87.30
Summary
The City of Beloit's Floodplain Zoning Ordinance requires new construction in mapped floodway, floodfringe and general floodplain districts to build to a flood protection elevation that includes 2 feet of freeboard above the regional flood level. In AO/AH zones the lowest floor must clear the highest of three benchmarks set by the Zoning Officer.
5-419STANDARDS FOR DEVELOPMENT IN THE GENERAL FLOODPLAIN DISTRICT. ... a.In AO/AH zones, the structure's lowest floor must meet one of the conditions listed below, whichever is higher:1.At or above the flood protection elevation; or2.Two feet above the highest adjacent grade around the structure; or3.The depth as shown on the FIRM. ... Flood Protection Elevation. An elevation of 2 feet of freeboard above the water surface profile elevation designated for the regional flood. Also see "Freeboard."
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Update 01 - 05-2026).
Full Breakdown
Chapter 19's Floodplain Zoning Ordinance (Article V) divides Beloit's regional floodplain into a floodway district, a floodfringe district and a general floodplain district, all mapped on the FIRM under §5-405. Under §5-419, a structure proposed in an AO or AH zone must have its lowest floor built to whichever is higher: the flood protection elevation, 2 feet above the highest adjacent grade, or the depth shown on the FIRM. The city's definitions section, §5-433, fixes the flood protection elevation itself at 2 feet of freeboard above the water surface profile elevation set for the regional flood, a margin meant to absorb ice jams, debris and wave action that push flood heights above the calculated level.
Residential structures elsewhere in the floodfringe must have their lowest floor, including basement, elevated to or above the flood protection elevation using fill, pilings, columns, posts or perimeter walls, or dry floodproofed under §5-428 in commercial cases. The Zoning Officer administers all floodplain development permits and can deny a permit outright under §5-406 if a project would obstruct flow or raise the regional flood height. No watercourse may be altered or relocated in a mapped floodplain without notifying adjoining municipalities, the DNR and FEMA and securing all state and federal permits first, per §5-407. 30, Wis. Stats.
Violations & Fines
A violation of the floodplain ordinance is enforced under Article 10 of Chapter 19 and is separately declared a public nuisance under §5-432: its creation may be enjoined and its maintenance abated by a suit brought by the City of Beloit, the State of Wisconsin, or any citizen, under Wis. Stat. § 87.30. Building below the flood protection elevation without a permit can also block final occupancy approval and later hazard-insurance eligibility.
Frequently Asked Questions
How much freeboard does Beloit require above the base flood elevation?
What elevation applies to a house in an AO or AH flood zone in Beloit?
Who enforces Beloit's floodplain building requirements?
Sources & Official References
Other rules in Beloit
Compare Beloit to another location·View the Wisconsin environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Flood Elevation Requirements in Nearby Cities
How other cities in Rock County handle flood elevation requirements.