Shreveport, LA Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Residential freeboard
- 1 foot above base flood elevation, minimum
- Nonresidential alternative
- Engineer-certified floodproofing instead of elevation
- Enclosed space below floor
- 2+ openings, 1 sq in per sq ft
- Manufactured homes (Zone AE)
- I-beam elevated 1 foot above BFE
- Definition source
- Freeboard defined in Sec. 34-28
- Last amended
- Ord. No. 64, 2021, 5-11-21
Summary
New and substantially improved residential structures in Shreveport's special flood hazard areas must have their lowest habitable floor built at least one foot above the base flood elevation under Sec. 34-67(2). Nonresidential buildings get the same one-foot freeboard or must be certified floodproof by a licensed engineer or architect instead.
New construction and substantial improvement of any residential structure shall have the lowest habitable floor including equipment or mechanical items elevated to a minimum of one foot above the base flood elevation.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 85 Update 1 | Unified Development Code: Supplement 20).
Full Breakdown
Sec. 34-67 sets the elevation and construction standards that apply once a base flood elevation has been established for a Shreveport parcel under Sec. 34-30 or Sec. 34-49. For any new or substantially improved residential structure, the rule is direct: 'the lowest habitable floor including equipment or mechanical items elevated to a minimum of one foot above the base flood elevation.' The city's own definitions section, Sec. 34-28, defines 'freeboard' as 'the vertical distance between a surface or water level and the top of whatever contains or restrains it,' the safety margin the one-foot rule is built to provide.
Commercial, industrial and other nonresidential structures get the same one-foot elevation option, or an alternative: they may instead be built 'floodproof so that below the required flood protection level the structure is watertight with walls substantially impermeable to the passage of water,' with structural components able to resist hydrostatic and hydrodynamic loads, certified by a registered professional engineer or architect.
Where a structure has fully enclosed space below the elevated floor, Sec. 34-67(1) requires that space to equalize hydrostatic pressure automatically, through a minimum of two openings with combined net area of at least one square inch per square foot of enclosed area, with the lowest opening no higher than one foot above grade, unless a professional engineer certifies an equivalent design.
Manufactured homes get their own version of the same one-foot standard: those set on Zone AE sites must have the bottom of the home's longitudinal I-beam elevated at least one foot above the base flood elevation and securely anchored. The section has been amended repeatedly since 2016, most recently by Ord. No. 64, 2021.
Violations & Fines
Building below the required one-foot freeboard, or without the engineer-certified floodproofing alternative for nonresidential structures, is a Sec. 34-31 misdemeanor punished under the general penalty in Sec. 1-14. It also blocks the compliance certification the director of public works must record under Sec. 34-50 before signing off on the structure, and can cost the owner a variance denial under Sec. 34-54's hardship test.
Frequently Asked Questions
How high above the flood line must my house be built in Shreveport?
Can a commercial building skip the elevation requirement?
Do manufactured homes need to meet the same elevation rule?
Sources & Official References
Other rules in Shreveport
Compare Shreveport to another location·View the Louisiana environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.