Cecil County, MD Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing sections
Cecil County Code § 325-1, § 325-16, § 325-18
Enforcing agency
Department of Public Works
Applies in
Unincorporated county + non-adopting towns
Legal basis
Maryland Stormwater Act of 2007
Design standard
2000 Maryland Stormwater Design Manual
Permit prerequisite
Approved SWM + erosion/sediment plans

Summary

Cecil County's stormwater management ordinance, Code Chapter 325, applies to development in the unincorporated area and in any incorporated town without its own approved program; the Department of Public Works enforces it and must approve a stormwater plan before a grading or building permit can issue.

These county ordinances apply to unincorporated areas of Cecil County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

The purpose of this chapter is to protect, maintain and enhance the public health, safety, and general welfare by establishing minimum requirements and procedures that control the adverse impacts associated with increased stormwater runoff. ... The provisions of this chapter are adopted pursuant to the Maryland Stormwater Act of 2007 and Environment Article, Title 4, Subtitle 2, Annotated Code of Maryland, and shall apply to all development occurring within both the unincorporated area of Cecil County and the incorporated townships which have not adopted a stormwater management ordinance of their own. ... A grading and/or building permit shall not be issued for any parcel or lot unless an erosion and sediment control plan has been approved by the Cecil Soil Conservation District and a stormwater management plan has been approved by the Cecil County Department of Public Works as meeting all the requirements of the Design Manual and this chapter.

Full Breakdown

Section 325-1(A) states the chapter's purpose as protecting public health, safety and general welfare by controlling the runoff impacts of development, using environmental site design (ESD) "to the maximum extent practicable" to keep post-development runoff close to predevelopment conditions and to hold structural best-management practices to cases where ESD alone cannot do the job. " Section 325-1(C) puts the Department of Public Works in charge of coordinating and enforcing the chapter countywide and in any non-adopting town. The ordinance incorporates the 2000 Maryland Stormwater Design Manual and the USDA's Pond Code 378 by reference under § 325-2.

Before any grading or building permit can issue, § 325-16 requires an erosion and sediment control plan approved by the Cecil Soil Conservation District and a stormwater management plan approved by DPW, plus recorded easements, a recorded inspection and maintenance agreement, and a performance bond.

Violations & Fines

Section 325-18 lets DPW suspend or revoke a grading or building permit, or require plan revisions, after written notice, for reasons including violation of the approved plan's conditions, changes in site runoff characteristics, construction that departs from the approved plan, noncompliance with a notice of violation or stop-work order, or an immediate downstream danger. Section 325-20 backs that up with a required performance bond covering the full estimated construction cost of the stormwater facilities before a permit issues.

Frequently Asked Questions

Does Cecil County's stormwater ordinance reach unincorporated areas only?
No. Section 325-1(B) applies it to development in the unincorporated area of Cecil County and to any incorporated town that has not adopted its own stormwater management ordinance approved by the Maryland Department of the Environment, so it enforces in both settings.
Can I get a building permit without a stormwater plan?
No. Section 325-16 blocks any grading or building permit until the Cecil Soil Conservation District approves an erosion and sediment control plan and the Department of Public Works approves a stormwater management plan meeting the Design Manual's requirements, plus recorded easements and a maintenance agreement.
Who enforces Cecil County's stormwater rules?
The Cecil County Department of Public Works. Section 325-1(C) assigns it responsibility for coordinating and enforcing Chapter 325 across the unincorporated county and in any incorporated township without its own state-approved stormwater ordinance, and it also reviews every stormwater management plan.
Can my stormwater permit be revoked after approval?
Yes. Section 325-18 lets the Department of Public Works suspend or revoke a grading or building permit, after written notice, for reasons like violating plan conditions, changed runoff conditions, off-plan construction, or an immediate downstream danger, giving the permittee a chance to respond first.

Sources & Official References

Other rules in Cecil County

All Cecil County rules

Compare Cecil County to another location·View the Maryland environmental rules overview

Get notified when Stormwater Management in Cecil County, MD changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.