Impervious surface trigger
5,000 square feet or greater of new impervious surface
Land disturbance trigger
One acre or greater
Runoff reduction
Retain the first 1.0 inch of rainfall
Water quality fallback
Remove at least 80 percent of TSS from a 1.2-inch storm
Administrator
City engineer or designee (Sec. 46-135)
Appeal
Written appeal to city administrator within 30 days

Summary

In the City of Smyrna, Georgia, post-construction stormwater standards apply to new development or redevelopment that adds 5,000 square feet or more of impervious surface or disturbs one acre or more, and to any commercial or industrial hotspot regardless of size. The city engineer administers the article, and designs must follow the Georgia Stormwater Management Manual.

This article applies to the following activities: ... (1)New development that creates or adds 5,000 square feet or greater of new impervious surface area or that involves land disturbing activity of one acre of land or greater;(2)Redevelopment (excluding routine maintenance and exterior remodeling) that creates, adds, or replaces 5,000 square feet or greater of new impervious surface area or that involves land disturbing activity of one acre or more;(3)New development and redevelopment if:a.Such new development or redevelopment is part of a subdivision or other common plan of development; andb.The sum of all associated impervious surface area or land disturbing activities that are being developed as part of such subdivision or other common plan of development meets or exceeds the threshold in subsections (1) and (2) above.(4)Any commercial or industrial new development or redevelopment, regardless of size, that is a hotspot land use as defined in this article; and(5)Linear transportation projects that exceed the threshold in subsections (1) or (2) above.

Full Breakdown

Article V of Chapter 46 was adopted by Ord. No. 2022-04 on March 7, 2022. Section 46-135 appoints the city engineer or a designee as administrator, and Sec. 46-134 requires compliance with the design standards, calculations and methods of the Georgia Stormwater Management Manual (GSMM). If the MS4 permit of the city conflicts with the article, the permit controls; if the article conflicts with the GSMM, the article controls.

Section 46-137 exempts emergency work by government agencies, utility trenching with related pavement replacement, government stormwater or restoration projects, repairs the administrator deems necessary, certain agricultural and silvicultural activity, and installations solely to implement Americans with Disabilities Act requirements.

Section 46-138 sets the standards. Runoff reduction must retain the first 1.0 inch of rainfall on the site to the maximum extent practicable. Where the practicability policy finds that infeasible, the system must remove at least 80 percent of the average annual post-development total suspended solids load for runoff from a 1.2-inch rainfall event. Stream channel protection requires 24-hour extended detention of the one-year, 24-hour storm. Post-development peak discharge must be at least ten percent less than pre-development for the two-year, ten-year and 25-year storms, and for the 50-year and 100-year storms. Primary trout waters allow no elevation of natural stream temperature, and secondary trout waters no elevation exceeding two degrees Fahrenheit.

Section 46-139 requires a stormwater management plan prepared under the supervision of a registered professional engineer or registered landscape architect, with the hydrologic analyses, system design and downstream analysis sealed by a professional engineer. Under Secs. 46-144 and 46-147, the applicant delivers as-built drawings and a signed inspection and maintenance agreement, which the owner records in the property record for every parcel on the site.

Violations & Fines

The Community Development Department issues a written notice of violation with remedial measures and a completion date (Sec. 46-150). If the work is not done, it can issue a stop work order, withhold a certificate of occupancy, suspend, revoke or modify the permit, or cite the violator into municipal court, where punishment follows Sec. 1-8. Each act and each day is a separate offense.

Frequently Asked Questions

What projects trigger Smyrna stormwater standards?
Section 46-136 covers new development that adds 5,000 square feet or greater of impervious surface or disturbs one acre or greater, and redevelopment that creates, adds or replaces the same amount. It also covers subdivisions whose combined totals reach those thresholds, any commercial or industrial hotspot regardless of size, and linear transportation projects above the thresholds.
How much rainfall must a site manage?
Under Sec. 46-138(4), the system must retain the first 1.0 inch of rainfall through runoff reduction to the maximum extent practicable. Where that is found infeasible, the remaining runoff from a 1.2-inch rainfall event must be treated to remove at least 80 percent of the calculated average annual post-development total suspended solids load.
Who maintains the stormwater system after construction?
The owner does. Section 46-147 requires the owner to sign an inspection and maintenance agreement with the city, obligating the owner to inspect, clean, maintain and repair the system, and to record it at the cost of the owner. After a sale, the new owner has 30 days to notify the city of a new point of contact.
Can I appeal a stormwater decision?
Yes. Under Sec. 46-151, an aggrieved person appeals in writing to the city administrator within 30 days after the decision or order. The hearing is held within 30 days of receipt, and a written decision follows within 30 days of the hearing. The final step is a petition for writ of certiorari to the county superior court.

Sources & Official References

Other rules in Smyrna

All Smyrna rules

Compare Smyrna to another location·View the Georgia environmental rules overview

Get notified when Stormwater Management in Smyrna, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Stormwater Management in Nearby Cities

How other cities in Cobb County handle stormwater management.

Acworth, GA
Some Restrictions