Southborough, MA Environmental Rules: Stormwater Management (2026)
Key Facts
- Runoff rate standard
- No net increase in rate of runoff from the site
- Runoff volume standard
- No net increase across site boundaries, with stated exceptions
- Stormwater permit issuer
- Conservation Commission, § 154-5
- Plan preparers
- Massachusetts PE, registered land surveyor or licensed soil evaluator
- Storm drain enforcer
- Board of Health, Chapter 225
- Defined redevelopment threshold
- Land disturbance exceeding 5,000 square feet
Summary
In Southborough, a permitted project cannot be approved by the Conservation Commission unless it produces no net increase in the rate of stormwater runoff, no net increase in volume across site boundaries (with limited exceptions), and no adverse impact on abutting properties. The Board of Health separately bars dumping pollutants into the storm drain system under Chapter 225.
(4) There shall be no net increase in the rate of stormwater runoff from the site; (5) There shall be no net increase in the volume of stormwater runoff across the boundaries of the site unless provisions have been made to tie into the public storm drains, where available, with the approval of the appropriate parties or authorities, or the Commission has determined that all reasonable provisions have been made to minimize any changes in stormwater runoff at the site; (6) There shall be no adverse impacts to abutting properties from any increase in volume of stormwater runoff, including erosion, silting, flooding, sedimentation or impacts to wetlands, groundwater levels or wells;
Full Breakdown
Southborough regulates stormwater through two bylaws. Chapter 154, Stormwater and Erosion Control (adopted 3-25-2023, Article 30), governs runoff from new development and redevelopment and is enforced by the Conservation Commission. Chapter 225, Illicit Discharge (adopted 4-10-2006, Article 45), governs what enters the municipal storm drain system and is enforced by the Board of Health.
Section 154-1(B) requires that new development, redevelopment and all land conversion activities maintain after-development runoff characteristics as equal to or less than pre-development runoff characteristics. The Commission applies this through § 154-9(A), which bars approval unless there is no net increase in the rate of runoff, no net increase in volume across the site boundaries (subject to the storm drain tie-in and Commission-determination exceptions quoted above), and no adverse impact to abutting properties. Under § 154-5(D) the Commission uses the latest edition of the Massachusetts Stormwater Management Policy for design and sizing criteria.
The applicant submits a stormwater management and erosion control plan and an operation and maintenance plan prepared, stamped and signed by a professional engineer registered in Massachusetts, a registered land surveyor, or a Massachusetts licensed soil evaluator, as appropriate (§ 154-5(E)). The O&M plan remains on file with the Commission, the Planning Board, the Department of Public Works and the Town Engineer. At completion, § 154-9(D) requires as-built record drawings of structural stormwater controls, certified by a professional engineer. Section 154-2 defines redevelopment as construction, alteration or improvement exceeding land disturbance of 5,000 square feet where the existing land use is commercial, industrial, institutional, or multifamily residential.
On the drain side, § 225-7 prohibits dumping or discharging any pollutant or non-stormwater discharge into the municipal separate storm sewer system, a watercourse, a wetland resource area or the waters of the commonwealth, bars illicit connections, and bars obstructing the flow of stormwater into or out of the storm drain system without prior written approval from the Board. Section 225-8 exempts fire fighting, waterline flushing, sump pumps, landscape irrigation or lawn watering, noncommercial car washing, and dechlorinated pool water of less than one ppm chlorine.
Violations & Fines
Chapter 154 (§ 154-11(A)) subjects violators to fines, civil action, criminal prosecution and tax liens, with no dollar amount printed. Under Chapter 225 (§ 225-11) the Board of Health can order a violator to cease and desist and remediate by a deadline, charge the Town's abatement costs to the violator, and lien the property if costs go unpaid.
Frequently Asked Questions
What runoff limits apply to a new project in Southborough?
What design standards does the Conservation Commission use?
Can I discharge a sump pump or pool water to the street drain?
Who has to be told about a spill that could reach the storm drains?
Sources & Official References
Other rules in Southborough
Compare Southborough to another location·View the Massachusetts environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Stormwater Management in Nearby Cities
How other cities in this county handle stormwater management.