Southborough, MA Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Runoff rate standard
No net increase in rate of runoff from the site
Runoff volume standard
No net increase across site boundaries, with stated exceptions
Stormwater permit issuer
Conservation Commission, § 154-5
Plan preparers
Massachusetts PE, registered land surveyor or licensed soil evaluator
Storm drain enforcer
Board of Health, Chapter 225
Defined redevelopment threshold
Land disturbance exceeding 5,000 square feet

Summary

In Southborough, a permitted project cannot be approved by the Conservation Commission unless it produces no net increase in the rate of stormwater runoff, no net increase in volume across site boundaries (with limited exceptions), and no adverse impact on abutting properties. The Board of Health separately bars dumping pollutants into the storm drain system under Chapter 225.

(4) There shall be no net increase in the rate of stormwater runoff from the site; (5) There shall be no net increase in the volume of stormwater runoff across the boundaries of the site unless provisions have been made to tie into the public storm drains, where available, with the approval of the appropriate parties or authorities, or the Commission has determined that all reasonable provisions have been made to minimize any changes in stormwater runoff at the site; (6) There shall be no adverse impacts to abutting properties from any increase in volume of stormwater runoff, including erosion, silting, flooding, sedimentation or impacts to wetlands, groundwater levels or wells;

Full Breakdown

Southborough regulates stormwater through two bylaws. Chapter 154, Stormwater and Erosion Control (adopted 3-25-2023, Article 30), governs runoff from new development and redevelopment and is enforced by the Conservation Commission. Chapter 225, Illicit Discharge (adopted 4-10-2006, Article 45), governs what enters the municipal storm drain system and is enforced by the Board of Health.

Section 154-1(B) requires that new development, redevelopment and all land conversion activities maintain after-development runoff characteristics as equal to or less than pre-development runoff characteristics. The Commission applies this through § 154-9(A), which bars approval unless there is no net increase in the rate of runoff, no net increase in volume across the site boundaries (subject to the storm drain tie-in and Commission-determination exceptions quoted above), and no adverse impact to abutting properties. Under § 154-5(D) the Commission uses the latest edition of the Massachusetts Stormwater Management Policy for design and sizing criteria.

The applicant submits a stormwater management and erosion control plan and an operation and maintenance plan prepared, stamped and signed by a professional engineer registered in Massachusetts, a registered land surveyor, or a Massachusetts licensed soil evaluator, as appropriate (§ 154-5(E)). The O&M plan remains on file with the Commission, the Planning Board, the Department of Public Works and the Town Engineer. At completion, § 154-9(D) requires as-built record drawings of structural stormwater controls, certified by a professional engineer. Section 154-2 defines redevelopment as construction, alteration or improvement exceeding land disturbance of 5,000 square feet where the existing land use is commercial, industrial, institutional, or multifamily residential.

On the drain side, § 225-7 prohibits dumping or discharging any pollutant or non-stormwater discharge into the municipal separate storm sewer system, a watercourse, a wetland resource area or the waters of the commonwealth, bars illicit connections, and bars obstructing the flow of stormwater into or out of the storm drain system without prior written approval from the Board. Section 225-8 exempts fire fighting, waterline flushing, sump pumps, landscape irrigation or lawn watering, noncommercial car washing, and dechlorinated pool water of less than one ppm chlorine.

Violations & Fines

Chapter 154 (§ 154-11(A)) subjects violators to fines, civil action, criminal prosecution and tax liens, with no dollar amount printed. Under Chapter 225 (§ 225-11) the Board of Health can order a violator to cease and desist and remediate by a deadline, charge the Town's abatement costs to the violator, and lien the property if costs go unpaid.

Frequently Asked Questions

What runoff limits apply to a new project in Southborough?
Section 154-9(A) bars approval unless there is no net increase in the rate of stormwater runoff from the site, no net increase in volume across the site boundaries unless drain tie-in or Commission findings apply, and no adverse impacts to abutting properties from increased runoff volume.
What design standards does the Conservation Commission use?
Section 154-5(D) says the Commission uses the policy, criteria and information, including the specifications and standards, of the latest edition of the Massachusetts Stormwater Management Policy. Practices designed, constructed and maintained to those criteria are presumed protective of Massachusetts's water quality standards unless the regulations alter them.
Can I discharge a sump pump or pool water to the street drain?
Section 225-8 exempts discharge from sump pumps and from dechlorinated swimming pool or hot tub water of less than one ppm chlorine, provided the pool is drained in a way that does not cause a nuisance. Other pollutants and illicit connections remain barred by § 225-7.
Who has to be told about a spill that could reach the storm drains?
Under § 225-10, for oil or hazardous materials the responsible person must immediately notify the Southborough Fire and Police Departments and the Board of Health and Health Agent. For nonhazardous material, notice goes to the Board of Health and Health Agent no later than the next business day.

Sources & Official References

Other rules in Southborough

All Southborough rules

Compare Southborough to another location·View the Massachusetts environmental rules overview

Get notified when Stormwater Management in Southborough, MA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.