Skip to main content
CityRuleLookup

Cocoa, FL Fence Regulations: Fence Permit Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit required
Before any fence/wall built, altered or replaced
Application must include
Certified boundary survey
Nonconforming compliance deadline
February 24, 2014
Waiver process
Board of Adjustment, Art. XVII Sec. 8
Maximum penalty
$500 fine or 60 days jail

Summary

Cocoa requires a building permit before any fence or wall is erected, constructed, installed or replaced anywhere in the city. Appendix A, Article XIII, Section 5(c) requires the application to include a certified boundary survey showing property lines, the fence's exact location and dimensions, setbacks to existing structures and easements, and the construction material.

(c)Permit required. No fence or wall shall be erected, constructed, installed or replaced, unless specifically excepted herein, without first obtaining a building permit. Any application for a fence or wall permit shall include a certified boundary survey or other accurate and drawn to scale plan, which at a minimum includes the following:(1)Location of all property lines;(2)Exact location and dimension of the proposed fence or wall;(3)The location, dimension, and set-backs for all structures and easements located upon the property; and(4)The type of construction to be used for the fence or wall.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 17).

Full Breakdown

Under Appendix A, Article XIII, Section 5(c) of the Cocoa Code of Ordinances, no fence or wall may be erected, constructed, installed or replaced anywhere in the city without first obtaining a building permit, unless the fence is specifically excepted elsewhere in the section. The permit application must be supported by a certified boundary survey or another accurate, scaled drawing that shows, at a minimum, the location of all property lines; the exact location and dimensions of the proposed fence or wall; the location, dimensions and setbacks of all structures and easements already on the property; and the type of construction to be used.

The city reviews this material to confirm the fence meets the bulk regulations in Section 5(d), which set maximum heights by yard and zoning district, the prohibited-materials list, and the site-visibility triangle rule near intersections and railroad crossings. A limited set of installations are excepted from the general permit trigger, including temporary construction fencing tied to an active building permit, which must be removed within two weeks of the certificate of occupancy, and fencing required under the city's special-events ordinance. Preexisting nonconforming fences lawfully standing as of February 24, 2004 were exempt from the current standards but could not be extended in further violation, and any fence still nonconforming after that date had to reach full compliance by February 24, 2014.

Waivers from the bulk requirements go through the board of adjustment under Appendix A, Article XVII, Section 8, which weighs safety, visual impact, design compatibility and screening of nuisance conditions.

Violations & Fines

Installing a fence or wall without the required building permit is enforced under Appendix A, Article XXIV, Section 1: the city may pursue the violation through its code enforcement board or through civil or criminal court action, with a conviction carrying a fine of up to $500, imprisonment of up to 60 days, or both. Unpermitted fences that also violate height, material or setback standards face the same enforcement path.

Frequently Asked Questions

Do I need a permit to replace an existing fence in Cocoa?
Yes. Appendix A, Article XIII, Section 5(c) requires a building permit for erecting, constructing, installing or replacing a fence or wall, with only a few exceptions such as short-term construction fencing. The application must include a certified boundary survey showing property lines and the fence's exact dimensions and setbacks.
What has to be in a Cocoa fence permit application?
The application needs a certified boundary survey or an equivalent scaled drawing showing all property lines, the fence or wall's exact location and dimensions, the setbacks and easements affecting other structures on the lot, and the type of construction material to be used, per Section 5(c).
What if my fence doesn't meet the current rules?
A fence lawfully standing before February 24, 2004 was grandfathered, but any preexisting nonconforming fence had to be brought into full compliance by February 24, 2014, and none may be extended in a way that increases the nonconformity.

Sources & Official References

Other rules in Cocoa

All Cocoa rules

Florida rules heatmap·Compare Cocoa to another location·View the Florida fence regulations overview

Get notified when Fence Permit Requirements in Cocoa, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Fence Permit Requirements in Nearby Cities

How other cities in Brevard County handle fence permit requirements.

Titusville, FL
Some Restrictions
Melbourne, FL
Some Restrictions
Palm Bay, FL
Some Restrictions