Skip to main content
CityRuleLookup

Eagan, MN Fence Regulations: Fence Permit Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Temporary fence limit
30 days unless city-approved
Electric fences
A district, active farms only
Business/industrial fence height
8 ft, CUP for taller
Finished side rule
Must face away from owner's lot
Governing section
Eagan City Code § 11.70, Subd. 16

Summary

In the City of Eagan, City Code Sec. 11.70, Subd. 16 requires every fence to meet the safety and appearance rules in Chapter 10 and caps a temporary snow or erosion-control fence at 30 days unless the city approves a longer run for good cause. Above-ground electric boundary fences are allowed only on active farms in the Agricultural (A) district, and the finished side of any fence must face away from the owner's own lot.

Subd. 16.Fences.A.Construction and maintenance.1.Every fence shall be maintained in accordance with the building and structure safety and appearance regulations in chapter 10 of this Code. No temporary fence, such as snow fence or an erosion control fence, shall be permitted on any property for a period in excess of 30 days unless otherwise approved by the city for good cause.2.Above-ground electric boundary fences shall only be permitted in the A district when the property is an active farm.3.The finished side of all fences shall face away from the fence owner's lot. ... C.Business and industrial fences. Property line fences within all business and industrial districts shall not exceed eight feet in height, except by conditional use permit

Full Breakdown

Eagan City Code Sec. 11.70, Subd. 16 governs fence construction citywide. Subdivision 16.A.1 ties every fence's condition to the building and structure safety and appearance standards in Chapter 10 of the City Code, and it singles out temporary fencing: a snow fence or erosion-control fence cannot stand on a property for more than 30 days unless the city approves a longer period for good cause. That 30-day clock applies to construction sites, turf establishment, and similar short-term uses, and property owners who need more time must go back to the city rather than assume an automatic extension.

Subdivision 16.A.2 limits above-ground electric boundary fences to the Agricultural (A) zoning district, and only where the property is an active farm; an electric fence around a suburban yard or a hobby lot outside the A district does not qualify. Subdivision 16.A.3 requires the finished side of a fence, the side without exposed posts or structural framing, to face away from the fence owner's own lot, so the smooth side faces the neighbor or the street. On the commercial side, Subdivision 16.C caps property-line fences in the city's business and industrial districts at eight feet, though the city council can approve a taller fence through a conditional use permit.

Eagan's Community Development Department administers these standards through its planning and code enforcement staff, and a fence built without regard to the Chapter 10 safety rules or left up past its approved temporary window is subject to the city's general code enforcement process under Chapter 1.

Violations & Fines

A fence that violates City Code Sec. 11.70, Subd. 16, including a temporary snow or erosion-control fence left up beyond its 30-day window without city approval, is a violation of the City Code. Under Sec. 1.03, violating any chapter, section or subdivision of the City Code is punishable as a misdemeanor or a petty misdemeanor, and Sec. 1.09 treats a penalty or forfeiture as applying to each separate violation. Community Development code enforcement staff handle inspection and correction.

Frequently Asked Questions

How long can I leave a temporary snow fence up in Eagan?
City Code Sec. 11.70, Subd. 16.A.1 limits a temporary fence, such as a snow fence or an erosion-control fence, to 30 days on any property. The city can approve a longer period for good cause, so contact Community Development before the 30 days runs out if you need the fence to stay up longer, rather than leaving it in place without approval.
Can I install an electric fence around my property in Eagan?
Only in limited circumstances. Sec. 11.70, Subd. 16.A.2 permits above-ground electric boundary fences solely in the Agricultural (A) zoning district, and only when the property is an active farm. An electric fence on a residential lot outside the A district, or on A-zoned land that is not actively farmed, does not meet this standard.
Which side of my fence has to face my neighbor?
Sec. 11.70, Subd. 16.A.3 requires the finished side of the fence, the side that looks smooth rather than showing posts and rails, to face away from your own lot. In practice that means the finished face points toward the neighboring property or the street, not back at your own yard.
How tall can a fence be on a business or industrial property line in Eagan?
Sec. 11.70, Subd. 16.C caps property-line fences in the city's business and industrial zoning districts at eight feet. A property owner who wants a taller fence needs a conditional use permit approved by the city council before building above that eight-foot limit.

Sources & Official References

Other rules in Eagan

All Eagan rules

Compare Eagan to another location·View the Minnesota fence regulations overview

Get notified when Fence Permit Requirements in Eagan, MN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.