North Las Vegas, NV Fire Regulations: Propane Storage (2026)
Key Facts
- LP-gas permit
- Required (IFC § 105.6.27)
- Annual permit fee
- $80.00 per category
- Temporary permit fee
- $100.00 per category
- Late annual renewal
- +$80.00 per category
- Max penalty
- $1,000 fine / 6 months jail
Summary
North Las Vegas requires an annual Fire Code permit for LP-gas (propane) under Municipal Code § 15.92.070, tied to IFC Subsection 105.6.27. The Division of Building and Fire Safety charges $80.00 per category for the annual permit, or $100.00 for a temporary permit, with added fees if the deadline is missed.
A.Annual and Temporary Permits and Business License Inspection Fees. (See subsection C. for a list of the most commonly required permits.) 1. Annual permits $80.00 per category 2. Temporary permits $100.00 per category 3. Failure to pay for annual permits within sixty (60) days of permit inspection (fee charged in addition to the initial permit fees) $80.00 per category 4. Failure to obtain a required temporary permit (Fee charged in addition to the required permit fee) $100.00 per required permit ... C.Permit Categories. The following categories represent the most common activities requiring a permit. Additional information may be found by referring to the referenced subsection of 105.6 of the International Fire Code, 2018 Edition. IFC 105.6 Required Permits Subsection Subsection Permit Subsection Permit 105.6.1 Aerosol products 105.6.26 Liquid- or gas-fueled vehicles or equipment in assembly buildings 105.6.2 Amusement buildings 105.6.27 LP-gas
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 146 Update 1).
Full Breakdown
Chapter 15.92, the North Las Vegas Fire Code, adopts the International Fire Code by reference and layers on a local Permit and Service Fee Schedule at § 15.92.070. Subsection C lists the permit categories "that represent the most common activities requiring a permit," cross-referencing the IFC's own permit list at Section 105.6; LP-gas storage and use is listed against Subsection 105.6.27 in that table, alongside categories like aerosol products, aviation facilities and combustible dust operations. Subsection A sets the fees: an annual permit runs $80.00 per category and a temporary permit runs $100.00 per category.
Miss the 60-day window to renew an annual permit and the City adds another $80.00 per category; fail to obtain a required temporary permit before starting work and it's another $100.00 per required permit. Reinspections are free the first two times a violation is found during a permit inspection, but the third and later reinspections cost $80.00 each. The schedule exempts federal, state and local government entities from permit and plan-check fees, but not nonprofits. Because the fee table cross-references the IFC rather than restating gallon-by-gallon storage limits, the actual tank-size, setback and installation standards for residential LP-gas containers come from the adopted 2024 International Fire Code and its Southern Nevada Amendments themselves, enforced by the Fire Code Official, the Fire Chief or designee, under § 15.92.030.
Violations & Fines
Any violation of the North Las Vegas Fire Code, including operating without the required LP-gas permit, is a misdemeanor under § 15.92.060 punishable by a fine of up to $1,000.00, up to six months' imprisonment, or both, and "each day that prohibited conditions are maintained shall constitute a separate offense." The Fire Code Official or Building Official may also issue citations under § 15.92.050.
Frequently Asked Questions
Do I need a permit to store propane in North Las Vegas?
How much does a North Las Vegas LP-gas permit cost?
What's the penalty for storing propane without a permit in North Las Vegas?
Sources & Official References
Other rules in North Las Vegas
Compare North Las Vegas to another location·View the Nevada fire regulations overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.