Bossier City, LA Home Business: Home Daycare (2026)
Key Facts
- Zoning review
- Site plan review under UDC Sec. 3.7
- Access requirement
- Arterial or Collector street frontage
- State compliance
- State licensing for building, fire, health
- Outdoor area
- Fully fenced play area, separate from parking
- Legal citation
- UDC, Appendix A § 5.6.5
Summary
Bossier City lets day care facilities into designated residential districts only with site plan review, arterial or collector street access, state licensing, and fenced outdoor play areas kept separate from parking.
A day care facility may be permitted in certain residential districts shown in the Use Table, provided it abuts and draws access from an Arterial or Collector street. Site Plan Review, as specified in Section 3.7, is required for any day care center located within a residential district for approval or expansion. ... C.Outdoor play or activity areas shall be fenced or otherwise enclosed on all sides, as approved by the Executive Director, and shall consist of developable lands, but shall not include driveways, parking area or drop off areas.
Full Breakdown
Sec. 5.6.5 of the Unified Development Code governs where a day care facility can operate in a residential setting. The Use Table permits day care by right, with additional standards, only in certain residential districts, and any such facility abutting or accessing an Arterial or Collector street must go through site plan review under Sec. 3.7 before the city approves it or lets it expand. Operators must meet state licensing requirements for building, fire, safety and health codes on top of the city's own zoning standards.
Outdoor play or activity areas must be fenced or otherwise enclosed on all sides as approved by the Executive Director and must be built on developable land, excluding driveways, parking areas or drop-off zones. The site must provide either an on-site vehicle turnaround or separate entrance and exit points along with dedicated passenger loading and unloading areas. Where a day care shares a lot with other commercial uses, such as in a shopping center, its parking and drop-off areas must function independently of the general parking and traffic pattern for the other stores, and the Code recommends placing the day care in an end unit or a separate structure.
Inside a residential district, no structural or decorative change may alter the exterior residential character of the building used as a day care, and any new or remodeled structure must stay compatible with the surrounding neighborhood's residential look.
Violations & Fines
Operating a day care in a residential district without completing site plan review under Sec. 3.7, without state licensing, or without the required fenced play area and separated drop-off zone puts the facility out of compliance with Sec. 5.6.5's use standards, subjecting it to the Code's general zoning enforcement and nonconformity provisions.
Frequently Asked Questions
Can I run a day care out of my home in Bossier City?
Does a home day care need a fenced yard in Bossier City?
Can a home day care building look different from other houses on the street?
Sources & Official References
Other rules in Bossier City
Compare Bossier City to another location·View the Louisiana home business overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.