Skip to main content
CityRuleLookup

Boca Raton, FL Hurricane Preparedness: Roof Standards (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
City Code § 19-107(3)
Required at
Construction document review stage
Compliance proof
Product approval or engineer's sealed statement
Enforcing agency
Development Services Dept., Building Division
Max general penalty
$500 fine or 60 days jail

Summary

Boca Raton will not approve a roof permit until the construction documents spell out the roofing system, materials, fastening pattern, flashing, and wind resistance rating for that specific site. City Code Sec. 19-107(3) requires either a product evaluation proving compliance with the site's wind criteria or a sealed statement from the architect or engineer of record confirming the roof assembly meets it.

Roof assemblies. For roof assemblies required by the building code, the construction documents shall illustrate, describe and delineate the type of roofing system, materials, fastening requirements, flashing requirements and wind resistance rating that are required to be installed. Product evaluation and installation shall indicate compliance with the wind criteria required for the specific site or a statement by an architect or engineer for the specific site shall be submitted with the construction documents to show compliance with wind criteria.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 72 Update 1).

Full Breakdown

Before the building official signs off on plans, Sec. 19-107(3) of the building regulations chapter treats roof assemblies as their own review category, distinct from wall or floor systems. The construction documents must illustrate and describe the type of roofing system to be installed, the specific materials, the fastening requirements, the flashing details, and the wind resistance rating the assembly carries. Product evaluation and installation must show compliance with the wind criteria required for the specific site, meaning the manufacturer's Florida product approval or Miami-Dade Notice of Acceptance has to match the wind speed and exposure category mapped for that address, not a lower category.

Where a product approval does not cover the exact condition, the code allows a signed and sealed statement from the architect or engineer of record certifying site-specific compliance instead. This sits alongside Sec. 19-113, the minimum plan review criteria section, which lists wind requirements and impact-resistant coverings among the structural items the building official checks for every commercial and residential permit, and Table I at the end of that section, which sets elevation standards tied to the same flood design classes used for wind loading.

Reroofing and roofing repairs on 1- and 2-family homes are exempt from full plans examination under Sec. 19-113(3)(c)(3), but a permit and the required Florida Building Code roofing inspections, covering dry-in, insulation, roof coverings and flashing under Sec. 19-156(1)(f), still apply. The development services department's building division administers these reviews out of 200 Northwest 2nd Avenue.

Violations & Fines

Installing or altering a roof without the wind-resistance documentation Sec. 19-107(3) requires is a building code violation. There is no specific penalty listed in the section, so it falls under Sec. 1-16's general penalty: a fine of up to $500.00, up to 60 days in jail, or both, with each day of noncompliance counted as a separate offense. The building official can also refuse to issue a certificate of occupancy until the roofing inspections and documentation are complete.

Frequently Asked Questions

Does Boca Raton require a special wind rating for new roofs?
Yes. Sec. 19-107(3) of the City Code requires construction documents for any roof assembly to show the wind resistance rating of the system and prove, through product evaluation or an engineer's sealed statement, that the roof meets the wind criteria mapped for that specific site before the building official will approve the permit.
Can I reroof my house without a permit in Boca Raton?
No. Reroofing is exempt only from full plans examination under Sec. 19-113(3)(c)(3), not from the permit itself. The city still requires the roofing permit and the inspections listed in Sec. 19-156(1)(f), covering dry-in, insulation, roof coverings and flashing, before the work is considered complete.
What happens if a roof is installed without the required wind documentation?
It is treated as a building code violation. Because Sec. 19-107(3) does not set its own fine, the city applies the general penalty in Sec. 1-16: up to a $500.00 fine, up to 60 days in jail, or both, with every day the violation continues counted as a new offense.

Sources & Official References

Other rules in Boca Raton

All Boca Raton rules

Florida rules heatmap·Compare Boca Raton to another location·View the Florida hurricane preparedness overview

Get notified when Roof Standards in Boca Raton, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.