Chandler, AZ Parking Rules: EV Charging (2026)
Key Facts
- Governing section
- Sec. 35-1902(j), Chandler Zoning Code
- Applies to
- PAD, commercial, industrial, multi-family sites
- Screening height
- Wall equal to or taller than equipment
- Advertising
- Prohibited on EVC spaces/equipment
- Adopted
- Ord. No. 5142, effective 11-13-2025
Summary
Chandler's zoning design standards require electric vehicle charging (EVC) spaces, charging equipment and any related transformers to sit on-site without displacing required parking or eating into a required landscape setback or landscape area. Ground-mounted equipment must be fully screened by masonry walls at least as tall as the equipment, and no advertising is allowed on the chargers or their enclosures.
(j) Electric vehicle charging stations:
1. All electric vehicle charging (EVC) spaces, charging stations, and associated transformers or other mechanical equipment, shall be provided on site, shall not displace any required parking spaces, and shall not be located within any required landscape setback or required landscape area.
2. All ground mounted equipment shall be fully screened by solid masonry walls and gates built to a height equal to, or greater than, the highest point on the mechanical equipment. Enclosure walls shall use materials and colors to match existing materials and colors on the site.
3. All transformer boxes and any other utility equipment not able to be screened by walls shall be painted to match the color of the building(s) on-site.
4. No advertising signage is permitted on the EVC spaces or associated equipment.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 79).
Full Breakdown
Section 35-1902, "General requirements," applies to nearly every site development plan filed under Article XIX of the Chandler Zoning Code, Planned Area Development, commercial, industrial, mobile home and multi-family projects, with the narrow exception of a single-family home, duplex, triplex or fourplex built individually rather than as part of a larger project (Sec. 35-1901, 35-1902(1)). Within that general-requirements section, subsection (j), added by Ordinance No. 5142 on November 13, 2025, sets four EVC-specific rules a developer must meet at the site plan stage. First, EVC spaces, charging stations and associated transformers or mechanical equipment must be provided on site and cannot displace a parking space the project is otherwise required to provide, nor sit inside a required landscape setback or landscape area.
Second, any ground-mounted equipment tied to the chargers must be fully screened with solid masonry walls and gates built to a height equal to or greater than the tallest point of the equipment, using materials and colors that match the rest of the site. Third, transformer boxes and other utility equipment that can't be screened by walls must instead be painted to match the building color, the same treatment the code requires for other utility boxes under Sec. 35-1902(f). Fourth, no advertising signage of any kind may appear on the EVC spaces or the associated equipment, closing off a revenue avenue some developers use elsewhere for charger sponsorships.
Violations & Fines
The Zoning Administrator reviews EVC siting and screening as part of the site development plan approval required under Article XIX, and Sec. 35-1907 bars issuance of a certificate of occupancy until on-site improvements, including EVC screening walls and equipment placement, match the approved plan. A charging installation that displaces required parking, sits in a landscape setback, or carries advertising must be corrected before the City will sign off on occupancy or a subsequent inspection.
Frequently Asked Questions
Can a Chandler business put EV chargers where required parking used to be?
Do EV charger transformers have to be hidden from view?
Can a property owner sell advertising space on an EV charging station in Chandler?
Sources & Official References
Other rules in Chandler
Compare Chandler to another location·View the Arizona parking rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
EV Charging in Nearby Cities
How other cities in Maricopa County handle ev charging.