Mesa, AZ Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

1-2 family/townhouse
1 EV-capable/ready/EVSE space per unit
R-2 multifamily
15% EV-capable or ready + 5% EVSE spaces
Cost exception threshold
$450/unit utility-side upgrade cost
Utility capacity exception
Reduced if utility can't supply capacity in 2 yrs
Adopted code
2024 IECC Appendix RE (Ord. No. 5987, 12-8-25)

Summary

Mesa's Energy Code requires new one- and two-family homes and townhouses with a garage or on-site private parking to include one EV-capable, EV-ready, or EVSE space per unit, and requires 15% EV-capable or EV-ready spaces plus 5% EVSE spaces for R-2 multifamily parking, under Mesa City Code Title 4, Chapter 9, Appendix RE.

APPENDIX RE ELECTRIC VEHICLE CHARGING INFRASTRUCTURE RE101.2.1 Quantity. New one- and two-family dwellings and townhouses with a designated attached or detached garage or other on-site private parking provided adjacent to the dwelling unit shall be provided with one EV capable, EV ready or EVSE space per dwelling unit. R-2 occupancies or allocated parking for R-2 occupancies in mixed-use buildings shall be provided with 15 percent EV capable spaces, or EV ready spaces and 5 percent EVSE spaces of the dwellings units or automobile parking spaces, whichever is less. Exceptions: 1.Where the local electric distribution entity certifies in writing that it is not able to provide 100 percent of the necessary distribution capacity within 2 years after the estimated certificate of occupancy date, the required EV charging infrastructure shall be reduced based on the available existing electric distribution capacity.

Source: Mesa EV Time of Use RateView official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 22).

Full Breakdown

The City adopted the 2024 International Energy Conservation Code, including its Appendix RE - Electric Vehicle Charging Infrastructure, by reference under Section 4-9-1 (Ord. No. 5987, effective December 8, 2025, per Resolution No. 12457). Section 4-9-2 then locally amends that appendix. 1, titled "Quantity," requires new one- and two-family dwellings and townhouses that have a designated attached or detached garage, or other on-site private parking adjacent to the unit, to provide one EV capable, EV ready, or EVSE (electric vehicle supply equipment) parking space per dwelling unit.

For R-2 occupancies, or allocated parking serving R-2 units within mixed-use buildings, the code requires 15 percent of dwelling units or parking spaces (whichever is less) to be EV capable or EV ready, plus 5 percent EVSE spaces. 5 would force a substation upgrade that raises the builder's or developer's utility-side cost by more than $450 per dwelling unit, that added infrastructure is not required. 25.

Violations & Fines

Chapter 4-9 amendments are enforced through the building permit and inspection process administered by the Building Safety Director; a new residential or R-2 project that fails to install the required EV-capable, EV-ready, or EVSE spaces cannot obtain approval or a certificate of occupancy. Chapter violations otherwise fall under the general Title 4 penalty of Section 4-1-9: a class one misdemeanor with a fine up to $2,500 and/or up to six months in jail, each day a separate offense.

Frequently Asked Questions

Does Mesa require EV charging capability in new homes?
Yes. Mesa City Code Section RE101.2.1 requires one EV capable, EV ready, or EVSE parking space per unit in new one- and two-family dwellings and townhouses that have a garage or on-site private parking.
What EV charging is required in new apartment buildings?
New R-2 occupancies, or R-2 parking within mixed-use buildings, must provide 15 percent EV-capable or EV-ready spaces plus 5 percent fully equipped EVSE spaces, calculated against dwelling units or parking spaces, whichever number is smaller.
Can a developer skip the EV charging requirement?
Only in two situations: the local utility certifies in writing it can't provide full distribution capacity within two years of occupancy, or meeting the substation standard in RE101.2.5 would add more than $450 per unit in utility-side cost.

Sources & Official References

Other rules in Mesa

All Mesa rules

Compare Mesa to another location·View the Arizona parking rules overview

Get notified when EV Charging in Mesa, AZ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

EV Charging in Nearby Cities

How other cities in Maricopa County handle ev charging.

Glendale, AZ
Some Restrictions
Scottsdale, AZ
Some Restrictions
Goodyear, AZ
Some Restrictions
Phoenix, AZ
Some Restrictions
Chandler, AZ
Some Restrictions
Tempe, AZ
Some Restrictions