Berwyn, IL Sidewalk & Pedestrian Rules: Encroachment Permits (2026)
Key Facts
- Permit issuer
- Director of Public Works, on written application
- Maximum duration
- No more than 90 days
- Roadway limit
- Material storage cannot exceed one-third of roadway width
- Curb clearance
- At least one foot between obstruction and curb line
- Sidewalk clearance
- At least six feet kept open and unobstructed
- Fine
- Up to $2,000 per violation under § 202.99, each day separate
Summary
In the City of Berwyn, Illinois, no one can store building materials or equipment on a street, alley, parkway or sidewalk without written permission from the Director of Public Works. Permission runs at most 90 days, and a sidewalk at least six feet wide must stay open.
§ 1020.01 TEMPORARY USE OF STREETS; PERMITS; LIMITATIONS. ... (A) A person who wishes to use a public street, roadway, court, alley or parkway in the city for the purpose of storing or depositing any building material, machinery, tool, tool box, tool shed, fuel or other supply, for any building or structure in the course of being constructed, moved, altered or repaired, shall first make application in writing to the Director of Public Works for permission to do so. ... No permission shall be granted for a period longer than 90 days. ... (C) The occupation of the sidewalk or street for the storage of building material shall not exceed one-third of the width of the roadway, and in all cases where the obstruction of the street is made, there shall be a clear space of not less than one foot between the obstruction and the curb line. ... During the progress of building operations, a sidewalk not less than six feet in width shall be at all times kept open and unobstructed for the purpose of passage in front of the lot.
Full Breakdown
Section 1020.01 of the Berwyn Code of Ordinances governs temporary private use of the public right-of-way for construction. A person who wants to use a public street, roadway, court, alley or parkway to store or deposit building material, machinery, tools, a tool shed, fuel or other supplies for a building being constructed, moved, altered or repaired must first apply in writing to the Director of Public Works. The application describes the location to be occupied, the use to be made of it, and how long the occupation will last.
Approval is discretionary. The Director grants permission only if the applicant has complied with the chapter and the city's building ordinances on bonds, fees and other requisites. Permission is meant only for imperative use in connection with actual erection, repair, alteration, wrecking or removal of buildings, ends when the work is complete or earlier if the Director requires, and cannot run longer than 90 days.
The permit carries physical limits. Storing building material cannot take up more than one-third of the width of the roadway, and a clear space of at least one foot must remain between the obstruction and the curb line. The permit covers only the frontage immediately in front of the lot where the building is under construction. During building operations a sidewalk not less than six feet wide must stay open and unobstructed for passage in front of the lot, and where excavations sit beside the sidewalk it must be protected by substantial railings for as long as the excavations remain. Under subsection (B), no one can occupy a sidewalk or street after the permitted operation is finished or store articles not intended for immediate use.
Related rules apply. Section 1020.03 requires yellow lanterns overnight at each end of a pile of material or an excavation in a street or alley. Section 440.03 bars anyone from obstructing or encroaching upon any public highway, street, alley or commons. Utilities building facilities in the right-of-way need a separate Building Department permit under § 1010.04, and in the C-1 through C-4 districts balconies and bay windows can project over the city right-of-way only with Zoning Administrator approval (§ 1246.14).
Violations & Fines
Chapter 1020 has no specific penalty clause. Section 1020.99 refers to the general penalty in § 202.99, which sets a fine of not more than $2,000 for each violation, with every day the violation continues counting as a separate offense. Occupying a sidewalk or street after the permitted work ends, or without a permit, falls under that fine schedule.
Frequently Asked Questions
Who issues a permit to use a Berwyn street or sidewalk for construction storage?
How long can a Berwyn street occupancy permit last?
How much sidewalk must stay open during construction in Berwyn?
Can I stack materials across the whole street frontage?
Sources & Official References
Other rules in Berwyn
Compare Berwyn to another location·View the Illinois sidewalk & pedestrian rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Encroachment Permits in Nearby Cities
How other cities in Cook County handle encroachment permits.