Berwyn, IL Sidewalk & Pedestrian Rules: Obstruction Rules (2026)
Key Facts
- Permit issuer
- Director of Public Works (§ 1020.01)
- Maximum permit period
- 90 days
- Sidewalk clearance during construction
- At least six feet open in front of the lot
- Material storage limit
- One-third of roadway width, one foot clear of curb line
- Restaurant table sidewalk clearance
- At least five feet open (§ 840.17)
- Maximum fine
- $2,000 per violation, each day separate
Summary
In the City of Berwyn, Illinois, no one can obstruct or encroach on a street, alley or public way, and construction crews must keep at least six feet of sidewalk open in front of a building lot. Occupying a street or sidewalk for construction storage needs a written permit from the Director of Public Works, capped at 90 days.
No person shall obstruct or encroach upon any public highway, private way, street, alley or commons in the city. No person shall park a vehicle upon a city parkway. ... (B) No person shall occupy a sidewalk or street after the completion of the operation for which the permit has been issued. No person shall occupy a sidewalk or street for the storage of articles not intended for immediate use in connection with the operation for which the permit has been issued. ... During the progress of building operations, a sidewalk not less than six feet in width shall be at all times kept open and unobstructed for the purpose of passage in front of the lot.
Full Breakdown
Section 440.03 of the Berwyn Code of Ordinances is the general rule: no person shall obstruct or encroach upon any public highway, private way, street, alley or commons in the city, and no person shall park a vehicle upon a city parkway. The detailed sidewalk standards sit in § 1020.01, which governs temporary use of streets and parkways for building materials, machinery, tools and supplies.
A person who wants to store or deposit those items on a public street, roadway, court, alley or parkway applies in writing to the Director of Public Works, describing the location, the intended use and the length of the occupation. No permission is granted for longer than 90 days, and it ends when the work is done or sooner if the Director requires. Once the operation is complete, no one may keep occupying the sidewalk or street, and articles not intended for immediate use cannot be stored there. Stored building material cannot exceed one-third of the width of the roadway, and a clear space of at least one foot must remain between the obstruction and the curb line. The permit covers only the area immediately in front of the lot where the building work is underway. During building operations a sidewalk not less than six feet wide stays open and unobstructed in front of the lot, and where excavations run alongside it the sidewalk is protected by substantial railings.
Related sections cover specific obstructions. Section 1020.02 bars storing earth from an excavation or rubbish from buildings on sidewalks or roadways and requires removal from day to day, with dry rubbish kept wetted down. Section 672.03 prohibits anyone but city snow crews from depositing snow, ice or slush on a street, sidewalk, alley or public place. Under § 840.17, the City Collector can permit restaurant tables on a public sidewalk only if at least five feet of open sidewalk remains and the applicant carries at least $1,000,000 in public liability insurance. Section 440.06 bars structures that encroach upon the state right-of-way on Cermak Road.
Violations & Fines
Section 440.99(A) sends obstruction violations to the general Traffic Code penalty in § 422.99, which in turn points to § 202.99. Under § 202.99(A), the fine is not more than $2,000 for each violation, and every day the violation continues is a separate offense. Section 1020.99 applies the same general code penalty to street-use violations under Chapter 1020. Storage that outlasts the permit, or a sidewalk narrowed below six feet during construction, counts as a violation each day it continues.
Frequently Asked Questions
Do I need a permit to put building materials on a Berwyn street or sidewalk?
How much sidewalk must stay open during construction in Berwyn?
Can a Berwyn restaurant put tables on the sidewalk?
What is the penalty for obstructing a Berwyn street or sidewalk?
Sources & Official References
Other rules in Berwyn
Compare Berwyn to another location·View the Illinois sidewalk & pedestrian rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Obstruction Rules in Nearby Cities
How other cities in Cook County handle obstruction rules.