Key Facts

Governing section
City Code § 16-0408, Article 4
Application lead time
At least 24 hours before work
Excavator's license
Required from city auditor (§ 16-0405)
Minimum bond
$5,000, held 3 years (§ 16-0407)
No-permit fee
Extra $100 charge (§ 16-0409)
Restoration duty
Site restored to prior good condition

Summary

Digging, tunneling, drilling, or boring in a Grand Forks public right-of-way requires a permit from the city engineer before work starts. City Code § 16-0408 requires the application at least twenty-four hours ahead of time, in writing, describing the excavation's nature, location, dates, and purpose, on top of licensing, bonding, and insurance the excavator must already carry under Article 4.

(1)It shall be unlawful for any person, firm or corporation to dig up, break, tunnel, drill, bore, or make any excavation in the public right-of-way, or any other public place, without first having obtained a permit, as herein required, or without complying with the provisions of this article or the terms of the permit.(2)Application for an excavation permit shall be made at least twenty-four (24) hours in advance, in writing, to the city engineer, on forms provided by the city engineer. The application shall state the name and address of the applicant, the date of commencement and estimated date of completion of the excavation, and shall set forth in detail the nature, location, and purpose of the excavation.

Full Breakdown

Section 16-0408 is the operative permit trigger inside Article 4, Encroachments, Obstructions and Excavations: no person, firm, or corporation may dig up, break, tunnel, drill, bore, or otherwise excavate in a public right-of-way or public place without a permit, and even a permit holder must still follow the article's other terms and the permit's own conditions. Getting there takes more than the application itself. Section 16-0405 requires anyone who excavates in the city to first hold an excavator's license issued by the city auditor, subject to a council-set fee.

Section 16-0406 layers on insurance: liability coverage of at least $250,000 per person injured and $500,000 per incident, plus $100,000 to $200,000 in property-damage coverage, approved by the city attorney before work begins. Section 16-0407 adds a $5,000 bond conditioned on repairing any opening for three years, though federal, state, and local government agencies and utility companies are exempt from both the bond and insurance rules. The written permit application itself, filed at least twenty-four hours before work under § 16-0408, must name the applicant, give start and estimated completion dates, and describe the excavation's nature, location, and purpose, backed by a dimensional sketch of the work; a bona fide emergency lets the excavator file after the fact if the intent to excavate was already reported by phone or in person.

Once issued, § 16-0409 sets an added $100 fee for anyone who excavates without first getting the permit, and § 16-0412 requires the site restored to as good a condition as existed before, with sidewalks, paving, and curbing replaced safely.

Violations & Fines

Excavating in a Grand Forks right-of-way without the permit required by § 16-0408 is unlawful and triggers an additional one-hundred-dollar fee under § 16-0409, on top of the underlying permit fee the council sets by resolution. A permittee who fails to restore the site to good and safe condition within three years, as § 16-0413 requires, exposes themselves to the city stepping in to repair or restore the area itself and recovering all costs and expenses from the excavator and any bond sureties. Because Article 4 does not print a separate criminal penalty for unpermitted excavation, a violation of § 16-0408 also falls under the citywide general penalty in § 23-0101.

Frequently Asked Questions

Do I need a permit to dig in a Grand Forks street right-of-way?
Yes. Section 16-0408 makes it unlawful to dig up, tunnel, drill, bore, or otherwise excavate in a public right-of-way or public place without first obtaining a permit from the city engineer and complying with the permit's terms and the rest of Article 4.
How far ahead of time must I apply for an excavation permit?
Section 16-0408 requires the written application at least twenty-four hours in advance, stating the applicant's name and address, start and completion dates, and the nature, location, and purpose of the excavation, along with a dimensional sketch of the work.
What insurance and bond does an excavator need in Grand Forks?
Section 16-0406 requires liability insurance of at least $250,000 per injured person and $500,000 per incident, plus property-damage coverage, approved by the city attorney. Section 16-0407 adds a minimum $5,000 bond conditioned on keeping the excavation site repaired for three years.
What if I excavate without getting a permit first?
Section 16-0409 imposes an added one-hundred-dollar fee on top of the regular permit fee for any excavation performed without a permit, and the unpermitted work remains subject to the citywide general penalty under § 23-0101.

Sources & Official References

Other rules in Grand Forks

All Grand Forks rules

Compare Grand Forks to another location·View the North Dakota sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in Grand Forks, ND changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.