Mount Prospect, IL Sidewalk & Pedestrian Rules: Encroachment Permits (2026)
Key Facts
- Permit issuer
- Director of community development
- Maximum term
- Ninety (90) days from issuance
- Renewal
- One additional thirty (30) days, with approval and added fee
- Fees
- Appendix A, division II of the Village Code
- Street width cap for materials
- No more than one-half of the street width in front of the property
- Mailbox setback
- Twelve inches from back of curb
Summary
In the Village of Mount Prospect it is unlawful to maintain any obstruction or encroachment on a street, alley, sidewalk or other public property unless the code authorizes it. Blocking public property takes a special permit from the director of community development, valid for at most ninety days.
It shall be unlawful for any person, firm or corporation to erect, construct, cause, create or maintain any obstruction or encroachment on any street, alley, sidewalk, any other public right of way or on any public property except as such obstruction or encroachment may be authorized by this section, by special permit under section 14.311 of this code or by any other ordinance or provision of this code. ... ... F. Street Obstruction Permit Fees; Deposits: No street, alley, parkway or other public property shall be obstructed without a special permit first having been secured from the director of community development. ... ... 3. The validity of such permit shall not exceed ninety (90) days after the date of issuance of same. 4. Said permit may be renewed for an additional thirty (30) days with the approval of the director of community development, and in such event the applicant shall pay an additional fee as set forth in appendix A, division II of this code.
Full Breakdown
Section 9.302 of the Village Code starts from a flat prohibition: no person, firm or corporation can erect, construct, cause, create or maintain an obstruction or encroachment on any street, alley, sidewalk, other public right of way or public property, unless section 9.302 itself, a special permit under section 14.311, or another provision of the code authorizes it.
Subsection F is the permit rule. No street, alley, parkway or other public property can be obstructed without a special permit first secured from the director of community development. The fee is set in appendix A, division II. The permit is not valid for more than ninety (90) days after issuance, and the director can approve one renewal of an additional thirty (30) days for an added fee from the same appendix. When the use ends, the permit amount is deducted from the deposit and the difference is returned. A separate permit fee applies to opening a street, sidewalk or alley to connect sewer, water, gas or electric piping.
Subsection D covers building work. An excavation in a street, parkway or alley, or storage of building materials on a street or alley, requires a street obstruction permit from the director of community development, and the permit ends when the building is complete. Materials cannot block a fire hydrant, water valve or manhole or the natural drainage, and no more than one-half of the street width in front of the property can be obstructed, at the discretion of the director of public works. Permit holders must maintain lighted warning lanterns and barricades every night. Mixing mortar or concrete on a sidewalk or street pavement is banned.
Subsection B allows U.S. postal service approved mailboxes in the right of way, with the front face twelve inches from the back of the curb, or twenty-four inches from the pavement where there is no curb, and the bottom of the box forty-eight inches above grade. Subsection A bans encroachments in the state-improved rights of way of Golf Road, Illinois Route 83, Euclid Avenue and others named there.
Violations & Fines
Maintaining an unpermitted obstruction or encroachment is unlawful under section 9.302. The Village can charge for placing warning lanterns when a permit holder fails to maintain them, and deducts the charge from the deposit. An entrance marker in disrepair can be declared a nuisance and abated, after posting a sign for five consecutive days stating the village's intent to remove it. Fines for Chapter 9 violations follow the penalty provisions in section 9.103 and the appendix schedule.
Frequently Asked Questions
Who issues a right-of-way obstruction permit in Mount Prospect?
How long does an obstruction permit last?
Can I put a mailbox in the parkway?
Can I store building materials on the street?
Sources & Official References
Other rules in Mount Prospect
Compare Mount Prospect to another location·View the Illinois sidewalk & pedestrian rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Encroachment Permits in Nearby Cities
How other cities in Cook County handle encroachment permits.