Key Facts

Approval
City council ordinance, signed by mayor
Processing fee
$1,500 application processing fee
Permit fee
$50 one-time encroachment permit fee
Exemption
City, parish, state, federal agencies fee-exempt
Standard
Must not adversely affect public interest
Related permit
Utility facilities use § 78-121 instead

Summary

Anyone wanting to build, place or extend something over, under or into a Shreveport street, alley, sidewalk or public right-of-way needs an encroachment permit, authorized by city council ordinance and signed by the mayor. The city engineer sets the application rules, and the permit carries a one-time $50.00 fee on top of a separate $1,500.00 processing fee.

Encroachment permits for use of city public rights-of-way. The city shall permit the encroachment over, under, or in any street, alley, sidewalk or other public place, where such encroachment is not a facility, defined herein, and does not adversely affect the public interest. An encroachment permit shall be authorized by ordinance of the city council and executed by the mayor, or his/her designee. The city engineer is authorized to establish a policy and regulations for the issuance of such encroachment permits. Encroachment permit application processing fee for persons or entities seeking to encroach upon the city's public rights-of way shall be $1,500.00. A one-time encroachment permit fee shall be $50.00 per encroachment permit.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 85 Update 1 | Unified Development Code: Supplement 20).

Full Breakdown

Chapter 78's definitions in section 78-120 split private use of the public right-of-way into two lanes: a 'facility' is a pipeline, cable, conduit, fiber line or similar utility running along, under or over the right-of-way, and gets its own facility permit under section 78-121 with linear-foot annual fees; anything else that protrudes into the right-of-way, and is not a small wireless or wireless telecommunications installation regulated separately under chapter 105, falls under the encroachment permit in section 78-122 instead. An encroachment permit is not issued administratively: it takes an ordinance passed by the city council and signed by the mayor or a designee, though the city engineer writes the implementing policy and regulations through the department of engineering and environmental services.

00 encroachment permit fee once approved; only city, parish, state and federal agencies skip paying both fees, though they still must apply. A related but separate authority, section 78-139, covers physical buildings or improvements on sidewalks and public grounds, including the sidewalk cafe permit for restaurants and bars in the D-1 Downtown district, and section 78-123 covers longer-term facility servitudes across city-owned property outside the right-of-way, priced at the servitude's 20-year appraised value.

Violations & Fines

There's no per-section penalty listed for encroaching without a permit, so an unauthorized structure, protrusion or use of the public right-of-way falls back on the general penalty in section 1-14: a fine of up to $1,000.00, up to 60 days in jail, or both, with each day the encroachment continues counted as a separate offense. The city can also refuse to authorize the encroachment by ordinance at all if the city council or city engineer finds it adversely affects the public interest, since section 78-122 conditions the permit on that finding.

Frequently Asked Questions

What counts as an encroachment versus a facility permit?
A 'facility' under section 78-120 is a pipeline, cable, conduit, fiber line or similar utility running along, under or over the right-of-way, and needs the linear-foot facility permit in section 78-121. Anything else that protrudes into a street, alley or sidewalk, and isn't a small wireless or wireless telecommunications installation covered elsewhere in chapter 105, needs the encroachment permit in section 78-122 instead.
How much does an encroachment permit cost in Shreveport?
Section 78-122 sets a $1,500.00 application processing fee for anyone seeking to encroach on the city's public rights-of-way, plus a separate one-time $50.00 encroachment permit fee once it's approved. City, parish, state and federal agencies don't pay either fee, but they still must submit an application to the department of engineering and environmental services.
Who actually approves an encroachment permit?
Not a staff office alone: section 78-122 requires the permit to be authorized by an ordinance of the city council and then executed by the mayor or a designee. The city engineer writes the implementing policy and regulations and runs the application process through the department of engineering and environmental services, but council action is what grants it.

Sources & Official References

Other rules in Shreveport

All Shreveport rules

Compare Shreveport to another location·View the Louisiana sidewalk & pedestrian rules overview

Get notified when Encroachment Permits in Shreveport, LA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.