Corona, CA Solar Energy: Expedited Solar Permitting (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Max system size
10 kW AC or 30 kW thermal
Eligible dwellings
Single-family or duplex rooftop only
Guideline deadline
Established by September 30, 2015
State law basis
Gov. Code § 65850.5
Application method
Electronic submittal required
First violation penalty
Infraction under § 15.70.020

Summary

Corona requires the Community Development Director to run a streamlined, expedited permit process for small residential rooftop solar systems up to 10 kilowatts AC (or 30 kilowatts thermal). The process, set by Corona Code of Ordinances § 15.68.020, must allow electronic submittal and follow a published checklist tied to state law.

(A) The City Council hereby delegates to the Community Development Director the duty, authority and power to establish, on or before September 30, 2015, and amend from time to time, guidelines and requirements for an expedited, streamlined permitting process for small residential rooftop solar energy systems. The guidelines shall be consistent with California Government Code Section 65850.5 and will allow for electronic submittal of permit applications and associated documentation. The Community Development Director shall also create the checklist required by California Government Code Section 65850.5 and any forms or other related documents necessary to implement this section. The guidelines, checklist and all other permitting documentation shall be accessible on the city's website (www.DiscoverCorona.com).

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2025 S-56: Supplement contains: Local legislation passed through Ord. 3423, passed 12-3-2025).

Full Breakdown

020). 020(A), the City Council delegated authority to the Community Development Director to establish, by September 30, 2015, and update over time, guidelines and requirements for an expedited, streamlined permitting process for qualifying systems. 5 and allow electronic submittal of applications and supporting documents. com. 02, meaning the city's standard building-permit procedures (plan check timelines, inspection requirements, permit expiration) still apply on top of the expedited track. 010(B) caps the system at 10 kilowatts AC (or 30 kilowatts thermal), requires compliance with adopted state fire, structural, and electrical codes plus Civil Code § 714(c)(iii), limits eligibility to systems on a single-family or duplex rooftop, and bars any panel or module array from exceeding the maximum legal building height for its zone. 68 and go through the city's regular building permit review instead.

Violations & Fines

Corona Code of Ordinances § 15.70.020 makes it unlawful to install, alter, or use any structure or equipment, including solar installations, in violation of Title 15 requirements. A first violation is an infraction; anyone convicted two or more times for a Title 15 violation within a continuous 12-month period is guilty of a misdemeanor. The Corona Police Department, Fire Code Official, Community Development Director, Building Official, and Code Enforcement Officer share enforcement authority under § 15.70.010, and Chapter 1.08 penalty provisions also apply.

Frequently Asked Questions

Who runs Corona's expedited solar permit process?
The Community Development Director administers it under Corona Code of Ordinances § 15.68.020, using guidelines and a checklist consistent with California Government Code § 65850.5, posted at www.DiscoverCorona.com along with required application forms.
What size solar system qualifies for expedited review in Corona?
Section 15.68.010(B) limits eligibility to systems no larger than 10 kilowatts AC nameplate rating or 30 kilowatts thermal, installed on the rooftop of a single-family or duplex dwelling, and not exceeding the zone's maximum building height.
Do Corona's regular building permit rules still apply to solar installs?
Yes. Section 15.68.020(B) applies the administrative provisions of Chapter 15.02 to solar permits, so standard plan check, inspection, and permit expiration rules layer on top of the expedited timeline.
What happens if a resident installs solar without the required permit?
Under § 15.70.020, unpermitted work violating Title 15 is an infraction; a second or later conviction within 12 months becomes a misdemeanor, enforced by Corona's Police Department, Fire Code Official, Building Official, and Code Enforcement Officer.

Sources & Official References

Other rules in Corona

All Corona rules

California rules heatmap·Compare Corona to another location·View the California solar energy overview

Get notified when Expedited Solar Permitting in Corona, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Expedited Solar Permitting in Nearby Cities

How other cities in Riverside County handle expedited solar permitting.

Palm Springs, CA
Light Restrictions
Menifee, CA
Light Restrictions
Temecula, CA
Light Restrictions
Murrieta, CA
Some Restrictions
Riverside, CA
Few Restrictions
Moreno Valley, CA
Few Restrictions