Skip to main content
CityRuleLookup

Huntington, NY Solar Energy: Expedited Solar Permitting (2026)

Few Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Section
Huntington Code § 157-13
Review deadline
14 business days
Standard-installation fee
$60
Max roof-mount height
6 inches above roof
PV roof-load limit
5 lbs/sq ft

Summary

Huntington fast-tracks building permits for standard residential solar installations, requiring a decision within 14 business days of a complete application. The flat application fee is $60, and the system must meet Long Island Unified Solar Permitting Initiative specs.

All building permit applications for installations of solar energy panels on residential and non-residential buildings, and legal accessory structures on residentially-utilized property shall be expedited by the Department of Engineering Services. Applications for "standard installations" on residential and legal accessory structures on residential property shall be determined within fourteen (14) business days of the filing of a completed application.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4940543; v75 updated 2026-06-09; through 06-09-2026).

Full Breakdown

L. No. 37-2011, requires the Department of Engineering Services to expedite all building permit applications for solar energy panels on residential and non-residential buildings and legal accessory structures on residentially-utilized property, and specifically mandates that applications for 'standard installations' on residential property be determined within 14 business days of filing a completed application. Section 157-14 sets the application fee for a standard residential installation at $60, tripling to three times that amount if installation began before the permit was applied for or issued. Section 157-15 defines a 'standard installation' as one that is not subject to architectural or Huntington Historic Preservation Commission review, is proposed for a roof with a single layer of covering, is flush-mounted parallel to the roof and no more than six inches above its surface, keeps an 18-inch clearing at the roof ridge, adds no more than five pounds per square foot of gravity roof load for photovoltaic systems or six pounds for solar hot water systems, uses a participating NY-Sun installer, and uses PV panels certified to UL 1703 and inverters tested to UL 1741.

Section 157-16 requires a sign or decal on the utility meter and any AC disconnect switch before a certificate of completion issues, flagging the presence of an operating solar co-generation system for utility workers and first responders. The program was modeled on the Long Island Unified Solar Permitting Initiative developed by the Suffolk County and Nassau County Planning Commissions and the Long Island Power Authority.

Violations & Fines

Chapter 157 does not carry its own dedicated penalty schedule for solar fast-track applications; standard installations that fall outside the criteria in § 157-15, such as ballasted or non-flush-mounted systems, tiled or multi-layer roofs, or non-certified equipment, simply lose eligibility for the 14-business-day expedited review and revert to the Town's ordinary building-permit process and fee schedule under Chapter 87.

Frequently Asked Questions

How fast will Huntington review a residential solar permit application?
Section 157-13 requires the Department of Engineering Services to determine applications for standard residential solar installations within 14 business days of the filing of a completed application, ahead of the Town's normal building-permit queue.
What does Huntington charge for a solar permit?
Section 157-14 sets the fee for a standard installation on a residential structure or legal accessory structure at $60, but if the installation has already started before a permit is applied for, the fee triples to three times that amount.
What makes a solar installation 'standard' for Huntington's fast track?
Section 157-15 requires a flush roof mount no more than six inches above a single-layer roof, an 18-inch ridge clearing, a gravity load under five pounds per square foot for photovoltaic panels, installation by a participating NY-Sun installer, and UL-certified panels and inverters, with no architectural or Historic Preservation Commission review required.

Sources & Official References

Other rules in Huntington

All Huntington rules

New York rules heatmap·Compare Huntington to another location·View the New York solar energy overview

Get notified when Expedited Solar Permitting in Huntington, NY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Expedited Solar Permitting in Nearby Cities

How other cities in Suffolk County handle expedited solar permitting.

Babylon, NY
Light Restrictions
Islip, NY
Some Restrictions