Huntington, NY Solar Energy: Expedited Solar Permitting (2026)
Key Facts
- Section
- Huntington Code § 157-13
- Review deadline
- 14 business days
- Standard-installation fee
- $60
- Max roof-mount height
- 6 inches above roof
- PV roof-load limit
- 5 lbs/sq ft
Summary
Huntington fast-tracks building permits for standard residential solar installations, requiring a decision within 14 business days of a complete application. The flat application fee is $60, and the system must meet Long Island Unified Solar Permitting Initiative specs.
All building permit applications for installations of solar energy panels on residential and non-residential buildings, and legal accessory structures on residentially-utilized property shall be expedited by the Department of Engineering Services. Applications for "standard installations" on residential and legal accessory structures on residential property shall be determined within fourteen (14) business days of the filing of a completed application.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4940543; v75 updated 2026-06-09; through 06-09-2026).
Full Breakdown
L. No. 37-2011, requires the Department of Engineering Services to expedite all building permit applications for solar energy panels on residential and non-residential buildings and legal accessory structures on residentially-utilized property, and specifically mandates that applications for 'standard installations' on residential property be determined within 14 business days of filing a completed application. Section 157-14 sets the application fee for a standard residential installation at $60, tripling to three times that amount if installation began before the permit was applied for or issued. Section 157-15 defines a 'standard installation' as one that is not subject to architectural or Huntington Historic Preservation Commission review, is proposed for a roof with a single layer of covering, is flush-mounted parallel to the roof and no more than six inches above its surface, keeps an 18-inch clearing at the roof ridge, adds no more than five pounds per square foot of gravity roof load for photovoltaic systems or six pounds for solar hot water systems, uses a participating NY-Sun installer, and uses PV panels certified to UL 1703 and inverters tested to UL 1741.
Section 157-16 requires a sign or decal on the utility meter and any AC disconnect switch before a certificate of completion issues, flagging the presence of an operating solar co-generation system for utility workers and first responders. The program was modeled on the Long Island Unified Solar Permitting Initiative developed by the Suffolk County and Nassau County Planning Commissions and the Long Island Power Authority.
Violations & Fines
Chapter 157 does not carry its own dedicated penalty schedule for solar fast-track applications; standard installations that fall outside the criteria in § 157-15, such as ballasted or non-flush-mounted systems, tiled or multi-layer roofs, or non-certified equipment, simply lose eligibility for the 14-business-day expedited review and revert to the Town's ordinary building-permit process and fee schedule under Chapter 87.
Frequently Asked Questions
How fast will Huntington review a residential solar permit application?
What does Huntington charge for a solar permit?
What makes a solar installation 'standard' for Huntington's fast track?
Sources & Official References
Other rules in Huntington
New York rules heatmap·Compare Huntington to another location·View the New York solar energy overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Expedited Solar Permitting in Nearby Cities
How other cities in Suffolk County handle expedited solar permitting.