- Review timeline
- 14 business days for standard installations
- Permit fee
- $60 flat fee, residential standard installation
- Late-start penalty
- Fee triples if work starts before permit
- Enforcing agency
- Department of Engineering Services
- Roof clearance
- 18-inch clearing path to roof ridge required
Summary
Huntington expedites solar panel permits through the Department of Engineering Services under a Solar Energy System Fast Track process. Standard residential installations must be decided within fourteen business days of a completed application, and the building permit fee is a flat sixty dollars, tripling if installation begins before the permit issues.
§ 157-13. Solar Panels. All building permit applications for installations of solar energy panels on residential and non-residential buildings, and legal accessory structures on residentially-utilized property shall be expedited by the Department of Engineering Services. Applications for "standard installations" on residential and legal accessory structures on residential property shall be determined within fourteen (14) business days of the filing of a completed application.
§ 157-14. Fees. All building permit application fees for standard installations of solar energy panels on residential structures or legal accessory structures on residentially-utilized property shall be sixty ($60) dollars, provided the installation has not been commenced or completed before a permit has been applied for or issued. In cases where installation has been commenced, the application fee shall be three (3) times the amount established in Chapter 87.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4940543; v75 updated 2026-06-09; through 06-09-2026).
Full Breakdown
Under Town Code Article III (§§ 157-12 through 157-17), added in 2011 to align with the Long Island Unified Solar Permitting Initiative, the Department of Engineering Services must expedite every building permit application for solar panels on residential, non-residential and accessory structures. Applications for a "standard installation" on a residential or accessory structure must be decided within fourteen business days of filing a completed application. The flat permit fee for a standard residential installation is sixty dollars, set by a 2015 amendment; if installation is commenced or completed before the permit is applied for or issued, the fee jumps to three times the amount set under Chapter 87.
To qualify as a "standard installation" eligible for the fast track, a project must not require architectural review or Huntington Historic Preservation Commission review, must sit on a single-layer roof, be mounted flush and parallel no more than six inches above the surface, leave an eighteen-inch clearing at the roof ridge and an eighteen-inch clearing path to it, and add no more than five pounds per square foot of roof load for photovoltaic panels or six pounds per square foot for solar hot water systems.
Installers must participate in the NY-Sun program, and panels and inverters must carry Underwriters Laboratory certification. Before the Town issues a certificate of completion, the owner must affix a sign or decal to the utility meter and any AC disconnect switch identifying the site as an operating solar electric co-generation system.
Violations & Fines
Installing solar panels without first obtaining the Town permit, or beginning work before the permit is issued, triggers the tripled fee under § 157-14 rather than a fixed civil penalty, since the fast-track article is a permitting and fee provision. A project that fails the standard-installation criteria of § 157-15 loses fast-track eligibility and must go through the Department of Engineering Services' regular building permit review instead.
Frequently Asked Questions
How long does Huntington take to approve a solar panel permit?
What does a standard residential solar permit cost in Huntington?
What roof-mounting rules qualify a solar project for the fast track?
Sources & Official References
Other rules in Huntington
New York rules heatmap·Compare Huntington to another location·View the New York solar energy overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Panel Permits in Nearby Cities
How other cities in Suffolk County handle panel permits.