Ogden, UT Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit issuer
Building Official, Community & Economic Development
Prerequisite approval
Written land use permit from Director
Also needs a land use permit
Fences over 4 ft, hard-surfacing, chickens
Fee basis
Title 4, Chapter 6; nonrefundable
First violation penalty
Class C misdemeanor
Expanded permit list effective
April 1, 2003

Summary

In Ogden City, a building permit from the Building Official is required before erecting, constructing, reconstructing or altering any building, or changing its use or occupancy, and no building permit issues until Community and Economic Development's Director has separately approved a written land use permit under Ogden City Code § 15-1-7.

It is unlawful for any person, whether acting as owner, occupant or contractor, or otherwise, to erect, construct, reconstruct or alter, or change the use or occupancy of any building or other structure within the City contrary to any provisions of this title, or without first obtaining a building permit from the building official. No building permit shall be issued by the building official unless a written land use permit has been issued by the Director and, if otherwise required by the provisions of this title, by the Planning Commission or the Mayor. ... Effective April 1, 2003, it is unlawful for any person, whether acting as owner, occupant or contractor, to fail to obtain a written land use permit from the Director for: 1. The installation of any asphalt, concrete, or other hard surface material or structure on any property, other than walkways, ornamental landscaping features, or for the minor repair of existing legal hard surfaced areas; or ... ... 4. The keeping of residential chickens.

Full Breakdown

Ogden City Code § 15-1-7 makes it unlawful for an owner, occupant or contractor to erect, construct, reconstruct or alter a building, or to change its use or occupancy, without first obtaining a building permit from the Building Official. The Building Official cannot issue that permit until the Community and Economic Development Director has separately approved a written land use permit, and, where the title requires it, until the Planning Commission or the Mayor has also acted. Since April 1, 2003, the ordinance has also required a stand-alone written land use permit, without a building permit, for four narrower categories of work: paving or hard-surfacing a lot (other than walkways, ornamental landscaping or minor repair of an existing legal surface); any change of use of a lot or parcel that does not itself involve construction; installing a fence over four feet tall in a required yard, or any fence inside a sight-triangle area defined at Ogden City Code § 7-3-2; and keeping residential chickens.

Every application for a building or land use permit must include a scale plan showing lot dimensions, existing and proposed structures and neighboring buildings, and the Building Official keeps a record of every application and permit issued. Fees for examining plans, issuing permits and processing related zoning matters are set in Title 4, Chapter 6, and once assessed must be paid before an application is accepted; those fees are non-refundable once the process starts. A related certificate of occupancy and zoning compliance, required by § 15-1-8 before any new or altered building can be used, is applied for at the same time as the building or land use permit and issues only once construction matches the approved plans.

Violations & Fines

Building without the required permit is enforced under Ogden City Code § 15-1-17: a violation is a class C misdemeanor punishable under Title 1, Chapter 4, Article A, or the Director may instead pursue escalating civil citations under Article B, moving from an initial to an intermediate to a maximum penalty on repeat violations, with each day of unpermitted work counted as a separate offense. The city may also seek an injunction or abatement, since an unpermitted structure is itself declared a public nuisance under § 15-1-10.

Frequently Asked Questions

Does Ogden require a permit to build a fence?
Yes for tall or sight-triangle fences: under Ogden City Code § 15-1-7(B)(3), a written land use permit is required for any fence over four feet tall in a required yard area, or any fence placed within a sight-triangle area defined at § 7-3-2, even though no separate building permit applies to the fence itself.
Do I need a permit to keep chickens in Ogden?
Yes. Section 15-1-7(B)(4) requires a written land use permit from the Director before keeping residential chickens, separate from any building permit needed for a coop, on top of any standards in Title 13's animal chapter.
What happens if I build without a permit in Ogden City?
The Building Official can order you to cease and desist under § 15-1-5, and § 15-1-17 makes the violation a class C misdemeanor or subjects you to escalating civil penalties, with each day of continued construction charged as a separate offense.
Who issues building permits in Ogden?
The Building Official in Community and Economic Development issues building permits, but only after the Director has approved a written land use permit and, where required, the Planning Commission or Mayor has acted, per § 15-1-7(A).

Sources & Official References

Other rules in Ogden

All Ogden rules

Compare Ogden to another location·View the Utah building safety overview

Get notified when Building Permits in Ogden, UT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.