Redondo Beach, CA Building Safety: Building Permits (2026)
Key Facts
- Code adopted
- 2025 California Building Code
- Permit expiration
- 12 months if work not started
- Late-start penalty
- double the permit fee
- Max fine
- $1,000 per violation per day
- Remodel valuation
- 65% of new construction cost
Summary
Redondo Beach requires a separate building permit before any structure regulated by the California Building Code is erected, altered, moved, repaired, or demolished within city limits. The Building Official issues permits, and the city has adopted the 2025 California Building Code with local amendments.
[A] 105.1 Permits Required. Except as specified in Section [ A] 105.2 of this Section, no building or structure regulated by this code shall be erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted, demolished, or change of occupancy of a building or structure, unless a separate permit for each building or structure has first been obtained from the Building Official.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4889554; v14 updated 2026-05-12).
Full Breakdown
01 adopts the 2025 California Building Code, including Chapter 33 and Appendices B, F, G, H, I, J, P and Q, as the city's Building Code governing construction, alteration, repair, moving, demolition, and occupancy of buildings citywide. 1 of that code to require a separate permit for each building or structure before work begins, obtained from the Building Official. 2: one-story detached accessory buildings such as tool sheds and playhouses under 120 square feet with no electrical, mechanical, or plumbing work; wood fences up to 6 feet and masonry or concrete fences up to 5 feet unless built on a slope or retaining earth; and small prefabricated above-ground swimming pools under 18 inches deep holding less than 5,000 gallons.
4. 06 if work does not commence within 12 months of issuance or is suspended for 12 months after commencing, though the Building Official may grant extensions of up to 180 days at a time, not to exceed two years total. 2 is required for new commercial construction before use or occupancy begins; for single-family dwellings, condominiums, and changes of use in existing buildings, the final permit inspection itself serves as the certificate of occupancy.
Violations & Fines
Working without a required permit doubles the total permit fees and all enforcement costs under Section [A] 109.4. Beyond the fee penalty, § 9-1.04 makes it unlawful to erect, alter, or demolish a building in violation of the code, punishable as a misdemeanor with a fine of up to $1,000, imprisonment in county jail up to six months, or both. Each day a violation continues is a separate offense.
Frequently Asked Questions
Do I need a permit to build a storage shed in Redondo Beach?
What happens if I start construction before getting a permit?
How long is a Redondo Beach building permit valid?
Sources & Official References
Other rules in Redondo Beach
California rules heatmap·Compare Redondo Beach to another location·View the California building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Building Permits in Nearby Cities
How other cities in Los Angeles County handle building permits.