Bloomfield, NJ Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified October 2026

Key Facts

Enforcing agency
Community Development Department, with an Electrical Subcode Official
Receptacles and fixtures
$90 up to 20 items, $25 each additional 20
Service panels
$90 up to 200 amps, $500 at 1,001 amps or more
Solar (photovoltaic)
$90 for one to 50kw, $600 over 100kw
Site lighting
$125 for one to five poles
Minimum fee
$90 for any one subcode

Summary

Electrical work in Bloomfield Township, New Jersey is permitted and priced under § 149-8B(4) of the Township Code. Receptacles and fixtures cost $90 for up to 20 items, service panels run from $90 to $500 by amperage, and photovoltaic systems are priced by kilowatt size. The Electrical Subcode Official sits in the Community Development Department.

(4) Electrical Fixtures and Devices: (a) The fees for receptacles, fixtures, wall switches, smoke and heat detectors, or similar devices shall be as follows: [1] Up to 20 items: $90. [2] Each additional 20 items or part thereof: $25. (b) Fees for site lighting shall be as follows: [1] One to five poles: $125. [2] Each additional: $20. ... (d) Service entrance panels/subpanels/motor controls: [1] Up to 200 amps: $90. [2] 201 to 400 amps: $160. [3] 401 to 1,000 amps: $300. [4] 1,001 amps or greater: $500. ... (h) Photovoltaic systems: [1] One to 50kw: $90. [2] 51 to 100kw: $165. [3] Over 100kw: $600.

Full Breakdown

In Bloomfield Township, Essex County, electrical permits are administered by the State Uniform Construction Code enforcing agency, the Community Development Department. Section 149-6 lists an Electrical Subcode Official among the agency's positions, and the Construction Official is chief administrator. The Township Code does not print an adopted edition of the National Electrical Code in Chapter 149. What the Township Council did adopt is the fee schedule in § 149-8B(4), last amended 5-19-2025 by Ord. No. 25-12.

For receptacles, fixtures, wall switches, smoke and heat detectors or similar devices the fee is $90 for up to 20 items and $25 for each additional 20 items or part thereof. Site lighting is $125 for one to five poles and $20 for each additional pole. Service entrance panels, subpanels and motor controls are $90 up to 200 amps, $160 from 201 to 400 amps, $300 from 401 to 1,000 amps and $500 at 1,001 amps or greater. Photovoltaic systems are $90 for one to 50kw, $165 for 51 to 100kw and $600 over 100kw.

The same subsection prices other electrical categories: appliances and heating, cooking and cooling equipment, motors by horsepower, signs and outline lights, lawn sprinklers and rain sensors at $90, sound systems and intercoms with low voltage wiring at $90, and communication points at $90 for one- and two-family dwellings. Pools and spas run $90 for aboveground pools, $125 for in-ground pools and $100 for hydromassage tubs, Jacuzzis and hot tubs.

The $90 minimum fee for any one subcode in § 149-8B applies to electrical work, plan review is 20% of the construction permit fee, and the state training surcharge under N.J.A.C. 5:23-4.19(b) is added. Nonprofit organizations can be exempted at the discretion of the Township Council.

Violations & Fines

Chapter 149 Article II prints no fine for electrical work done without a permit. Section 149-8B(4)(l) says all violation fees collected remain in the building department, to be used at the discretion of the Construction Official only. The Community Development Department is the office to contact about an electrical violation.

Frequently Asked Questions

How much does an electrical permit cost in Bloomfield Township, NJ?
It depends on the work. Section 149-8B(4) charges $90 for up to 20 receptacles, fixtures, switches or detectors and $25 for each additional 20. Service entrance panels are $90 up to 200 amps and $500 at 1,001 amps or greater. The minimum fee for any one subcode is $90.
What does a solar installation cost in permit fees in Bloomfield Township?
Section 149-8B(4)(h) prices photovoltaic systems by size: $90 for one to 50kw, $165 for 51 to 100kw and $600 for over 100kw. Plan review at 20% of the construction permit fee under § 149-8A and the state surcharge under N.J.A.C. 5:23-4.19(b) are separate charges.
Does the Bloomfield Township Code name an electrical code edition?
Chapter 149 does not name one. Section 149-6 establishes the State Uniform Construction Code enforcing agency with an Electrical Subcode Official under N.J.S.A. 52:27D-119 et seq., and § 149-8B(4) sets the electrical fees. The Community Development Department can tell you which standards the Electrical Subcode Official applies.
Who handles electrical inspections in Bloomfield Township?
The Electrical Subcode Official, a position established in § 149-6A, works within the Community Development Department under the Construction Official. An on-site inspection agency can be retained by contract in place of a particular subcode official under § 149-6B, and one person can hold more than one official position if qualified.

Sources & Official References

Other rules in Bloomfield

All Bloomfield rules

Compare Bloomfield to another location·View the New Jersey building safety overview

Get notified when Electrical Permits in Bloomfield, NJ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Electrical Permits in Nearby Cities

How other cities in Essex County handle electrical permits.

Newark, NJ
Some Restrictions