Bossier Parish, LA Building Safety: Electrical Permits (2026)
Key Facts
- Adopted electrical code
- NEC 2021, Sec. 19-3(g)
- Permit required
- Before install/alter/replace, Sec. 19-5(a)
- Minor exemption
- Lamp replacement, approved portable equipment
- Permit expiration
- 180 days if work not started
- Penalty
- $100-$500 fine per offense, Sec. 19-14
Summary
Bossier Parish adopts the 2021 National Electrical Code under Code Section 19-3(g) as the governing standard for electrical work outside the municipalities, and Section 19-5 requires a permit from the Bossier Parish Building Official before installing, altering or replacing any regulated electrical system.
Pursuant to La. R.S. 40:1730.21 et seq., the following construction codes (hereinafter sometimes referred to as "code") are hereby adopted as the regulations governing construction of buildings and other structures in Bossier Parish. ... (g)The National Electrical Code (NEC), 2021 or most current edition, as published by the National Fire Protection Association.
Full Breakdown
Under Section 19-3, the Bossier Parish Police Jury adopts, pursuant to La. S. , the construction codes that govern building work in unincorporated Bossier Parish, and Section 19-3(g) specifically adopts the National Electrical Code (NEC), 2021 or most current edition, as published by the National Fire Protection Association, as the electrical standard. Section 19-5(a) then makes it unlawful to erect, install, enlarge, alter, extensively alter, repair, remove, convert or replace any electrical system regulated by the adopted code without first obtaining a properly issued permit from the Bossier Parish Building Official.
A narrow set of minor electrical jobs is exempt from that permit requirement under Section 19-5(d): the replacement of lamps and the connection of approved portable electrical equipment to approved permanently installed receptacles do not need a permit. Applications must identify the work, describe the property, state the construction valuation, and, per Section 19-5(l), specifically note when the scope includes electrical work; the building official reviews the application and issues the permit once it is found to conform to the code. An issued electrical permit becomes invalid if the authorized work is not started within 180 days, or if it is suspended or abandoned for 180 days after starting, though the building official can grant extensions of up to 180 days at a time for justified cause under Section 19-5(p).
Every electrical permit or a copy must stay posted and visible at the front exterior of the job site until the project is complete, and Section 19-11 additionally bars a utility connection to any electrical system regulated by the code until the building official approves it.
Violations & Fines
Doing electrical work covered by the NEC without a permit from the Bossier Parish Building Official violates Sections 19-3 and 19-5; under Section 19-14 that is a misdemeanor punishable by a fine of not less than $100.00 nor more than $500.00 per offense, and the building official can also issue a stop-work order under Section 19-13.
Frequently Asked Questions
What electrical code does Bossier Parish use?
Do I need a permit to replace a light fixture?
How long is a Bossier Parish electrical permit good for?
Sources & Official References
Other rules in Bossier Parish
Compare Bossier Parish to another location·View the Louisiana building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.