Key Facts

Governing code
National Electrical Code (state-amended)
Permit lead time
8 hours before work begins
Emergency permit window
24 hours after work starts
Unpermitted-work penalty
100% of permit fee
Permit review deadline
60 calendar days
Enforcer
Building Official, Community Development Dept.

Summary

The City of Stonecrest requires a permit before any electrical installation, alteration or repair under Code Sec. 7-118, since the National Electrical Code governs electrical systems here under Sec. 7-59(2). Only ordinary repairs like replacing lamps or connecting portable equipment to existing outlets are exempt. The Community Development Department's Building Official issues permits and enforces the adopted electrical code.

(2)Electrical. The provisions of the National Electrical Code, as adopted and amended by the State Department of Community Affairs, shall apply to the installation of electrical systems, including alterations, repairs, replacement, equipment, appliances, fixtures, fittings, and appurtenances thereto. ... (2)Electrical.a.Repairs and maintenance. Ordinary repairs, including the replacement of lamps or the connection of approved portable electrical equipment to approved permanently installed receptacles.b.Radio and television transmitting stations. Electrical equipment used for radio and television transmissions, but permits are required for equipment and wiring for power supply, the installation of towers and antennas.c.Temporary testing systems. The installation of any temporary system required for the testing or servicing of electrical equipment or apparatus.

Full Breakdown

Under Sec. 7-59(2) of the Stonecrest Code, the National Electrical Code, as adopted and amended by the State Department of Community Affairs, applies to the installation of electrical systems, including alterations, repairs, replacements and fixtures. Sec. 7-23(a)(6) folds the NEC into the city's adopted state minimum standard codes, and Sec. 7-26(b) layers on local amendments, including a rule that a reinspection permit and reinspection is required before power is restored to any building disconnected for six months or more. Before any electrical work begins, Sec.

7-118(a) requires the applicant to obtain a permit at least eight hours ahead, or within 24 hours for emergency work. Sec. 7-118(d)(2) narrows the exemption list to ordinary repairs such as replacing lamps or connecting approved portable equipment to existing receptacles, temporary testing setups, and radio/TV transmission equipment other than towers, antennas and power wiring, which still need permits. Work that starts before the permit is issued draws a penalty equal to 100 percent of the usual permit fee on top of the fee itself, plus a Stop Work Order under Sec.

7-118(c). The Building Official within the Community Development Department reviews applications and must act within 60 calendar days under Sec. 7-118(f). Permits lapse after 180 days if work has not started, or after a 180-day gap in inspections, per Sec. 7-118(i). Sec. 7-61(o) authorizes the Building Official to bring charges against anyone installing electrical work who lacks the required State of Georgia license.

Violations & Fines

Performing electrical work without a permit is a Sec. 7-118(c) violation carrying a penalty of 100 percent of the standard permit fee in addition to the fee itself, and the Building Official issues a Stop Work Order that halts the job immediately. Continuing work after a stop order, or violating chapter 7 generally, is prosecuted in municipal court under Sec. 7-64, with each day of noncompliance treated as a separate offense subject to fine or imprisonment.

Frequently Asked Questions

Do I need a permit to replace an electrical outlet in my Stonecrest home?
No. Sec. 7-118(d)(2)a exempts ordinary repairs, including replacing lamps or connecting approved portable equipment to existing permanently installed receptacles. Rewiring, adding circuits, or installing new fixtures still needs a permit reviewed by the Community Development Department's Building Official before work starts.
What electrical code does Stonecrest enforce?
The city enforces the National Electrical Code as adopted and amended by the Georgia Department of Community Affairs under Sec. 7-59(2) and Sec. 7-23(a)(6), plus local amendments in Sec. 7-26(b) covering items like reinspection after long power disconnections.
What happens if a contractor starts electrical work before getting a permit?
Sec. 7-118(c) imposes a penalty equal to 100 percent of the usual permit fee, charged on top of the fee itself, and the Building Official can issue a Stop Work Order halting the job immediately until the permit issues.

Sources & Official References

Other rules in Stonecrest

All Stonecrest rules

Compare Stonecrest to another location·View the Georgia building safety overview

Get notified when Electrical Permits in Stonecrest, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.