Key Facts

Mandatory size threshold
25,000 sq ft interior space
Home incentive
$300.00 per home
Building incentive
$1,000.00 per building
Development project incentive
$2,500.00 per project
Green Building Bond
2 percent of construction cost
Bond hold period
Up to 24 months post-CO

Summary

Doral's green building chapter applies mandatory certification to any new building, reconstruction or land development project of 25,000 square feet or more, offering incentives of $300 per home, $1,000 per non-residential or multifamily building, and $2,500 per land development project once the building official confirms compliance.

This article applies to all developers or landowners proposing to construct a new building, land development project, government development project, or undertake a building reconstruction project comprising 25,000 square feet of interior space or more. All such buildings and associated sites must be designed to meet the nationally recognized green certification programs specified in section 63-4 herein. Also, all buildings and projects incorporating the green standards and certifications referenced herein to will be eligible for the incentives specified in this chapter regardless of size. ... If an application qualifies for green incentives under this chapter, then the value of the incentives provided to that application shall be $300.00 per home, $1,000.00 per non-residential, multi-family, institutional or mixed-use building, and $2,500.00 per land development project. The following types of incentives may be considered by the building official:(1)Reduced permit, inspection and/or impact fees; and(2)Expedited permitting.

Full Breakdown

Chapter 63 of the Land Development Code requires green certification, not merely encourages it, once a project crosses the 25,000-square-foot interior space threshold set in Sec. 63-2; smaller projects can opt in voluntarily to become eligible for the same incentives. Sec. 63-4 sets the certification standard by building type: non-residential, multifamily, institutional and mixed-use buildings must meet the Florida Green Building Coalition (FGBC), LEED, National Association of Home Builders' National Green Building Standard, or Green Globes System, while single-family homes, duplexes and townhouses must meet the FGBC Green Homes Program or the EPA Energy Star Program; the building official and planning and zoning director can approve an equivalent program on request.

To start, a developer files a letter of intent with the Doral building official under Sec. 63-3, describing the project's green features and target certification, along with a site plan, building plans, owner consent, and a sealed architect or engineer statement confirming the design meets the chosen standard. Sec. 63-5 gives the building official authority to determine the incentive level once compliance is certified. The incentive values in Sec. 63-6 are fixed: $300 per home, $1,000 per non-residential, multifamily, institutional or mixed-use building, and $2,500 per land development project, delivered as reduced permit, inspection or impact fees, or expedited permitting.

Before any building permit issues on a qualifying project, Sec. 63-7 requires the applicant to post a Green Building Bond equal to two percent of the master permit's construction cost value, held for up to 24 months after the certificate of occupancy until proof of certification is filed; failure to certify within that window forfeits the bond to the city's Green Element fund.

Violations & Fines

A project that meets the 25,000-square-foot threshold in Sec. 63-2 but fails to pursue the required certification is denied the green building permit track and cannot claim the Sec. 63-6 fee incentives; a project that already claimed incentives and posted a Green Building Bond forfeits the full two percent bond to the city if it cannot document certification within 24 months of the certificate of occupancy under Sec. 63-7.

Frequently Asked Questions

When is green certification mandatory in Doral, not just optional?
Sec. 63-2 makes certification mandatory for any new building, land development project, government project or reconstruction comprising 25,000 square feet of interior space or more; smaller projects may still opt in voluntarily to qualify for the same fee incentives.
How much is the green building incentive worth?
Sec. 63-6 fixes the incentive at $300.00 per single-family home, $1,000.00 per non-residential, multifamily, institutional or mixed-use building, and $2,500.00 per land development project, delivered through reduced permit, inspection or impact fees or expedited permitting.
What is the Green Building Bond and when do I get it back?
Sec. 63-7 requires a bond equal to two percent of the master building permit's construction cost before the permit issues; the city holds it for up to 24 months after the certificate of occupancy and releases it within 30 days of receiving proof of green certification, or forfeits it to the city's Green Element fund if certification is never documented.

Sources & Official References

Other rules in Doral

All Doral rules

Florida rules heatmap·Compare Doral to another location·View the Florida building safety overview

Get notified when Green Building Code in Doral, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Green Building Code in Nearby Cities

How other cities in Miami-Dade County handle green building code.

Miami, FL
Light Restrictions
Coral Gables, FL
Significant Restrictions