Sandy, UT Building Safety: Plumbing Permits (2026)
Key Facts
- Adopted code
- International Plumbing Code (State edition)
- Also adopted, same section
- IBC, IMC, NEC, IFGC, IECC, IRC
- Appeals body
- 7-member Board of Appeals
- Governing section
- City Code § 18-1-1
- Cross-connection tie-in
- Chapter 8-4 backflow rules
Summary
Sandy City Code Section 18-1-1 adopts the International Plumbing Code, along with the Building, Mechanical, Fuel Gas, Energy Conservation and Residential Codes, as amended by the State of Utah, governing every plumbing installation and permit in the city. Amendments and enforcement run through the Chief Building Official and the Board of Appeals created for the Building Code.
The following codes as adopted by the State unless stated otherwise are hereby adopted for use as part of this Code for use in Sandy City, State of Utah: The International Building Code, subject to the amendments to IBC applicable to Sandy City set forth in this chapter. The International Mechanical Code. The International Plumbing Code. The National Electrical Code. The International Fuel Gas Code. The International Energy Conservation Code. The 1997 Edition of the Uniform Code for the Abatement of Dangerous Buildings. The International Residential Code. The International Existing Building Code.
Full Breakdown
Sandy City Code Title 18, Chapter 1, 'Adoption of Uniform Codes,' Section 18-1-1 adopts, by reference, the International Plumbing Code as adopted by the State of Utah for use throughout Sandy City, alongside the International Building Code (subject to Sandy's own amendments), International Mechanical Code, National Electrical Code, International Fuel Gas Code, International Energy Conservation Code, 1997 Uniform Code for the Abatement of Dangerous Buildings, International Residential Code, and International Existing Building Code. A. ) currently designates, without a separate local ordinance each time the state updates editions.
Permit review and issuance run through the City's Chief Building Official under the administrative sections of Title 18; Section 18-1-2 creates a seven-member Board of Appeals, interviewed and appointed by the Mayor, to hear disputes over how the adopted codes, including plumbing requirements, are applied, with the Building Official sitting as a non-voting secretary. Cross-connection and backflow-prevention work tied to plumbing, covered separately in Chapter 8-4, likewise references 'the current Plumbing Code as adopted by the State of Utah' for its technical standards, and requires inspection by the City's Public Utilities Department before a certificate of occupancy issues for new commercial or industrial connections.
Any amendment specific to Sandy, such as its added Wildland-Urban Interface Appendix L construction standards, is layered on top of the adopted uniform codes rather than replacing them.
Violations & Fines
Plumbing work performed without the required permit, or that fails inspection under the adopted International Plumbing Code, can halt a project: the City withholds the certificate of occupancy until code compliance and any required backflow-prevention inspections are complete. Disputes over how the Chief Building Official applied the code go to the seven-member Board of Appeals created under Section 18-1-2 before any court appeal.
Frequently Asked Questions
Does Sandy have its own plumbing code?
Who do I appeal a plumbing permit decision to?
Do backflow devices need separate plumbing approval?
Sources & Official References
Other rules in Sandy
Compare Sandy to another location·View the Utah building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Plumbing Permits in Nearby Cities
How other cities in Salt Lake County handle plumbing permits.