Colorado Springs, CO Environmental Rules: Erosion Control (2026)
Key Facts
- Governing section
- City Code § 7.4.601 (GEC Permit)
- Permit trigger
- 1+ acre of land disturbance
- Erosion blanket
- Required on slopes 3:1 or steeper
- Slope analysis
- Required beyond 2.5:1 on permanent slopes
- Reviewing authority
- Stormwater Enterprise Manager (§7.5.506)
- Overlay districts
- HS-O/SS-O need extra Hillside/Streamside Plan
Summary
Private grading that disturbs one acre or more, is part of a larger project disturbing an acre or more, touches an open drainage channel, or builds or modifies a permanent control measure needs a Grading and Erosion Control (GEC) Permit under City Code § 7.4.601C, reviewed by the Stormwater Enterprise Manager under § 7.5.506.
C. Grading and Erosion Control (GEC) Permit: 1. No person shall undertake any grading on private property that will result in any of the following without first complying with the requirements of Subsection 2 below: a. Construction activities disturbing one (1) or more acres; ... c. Any grading or construction within an open drainage channel as determined by the review engineer... An erosion control blanket shall be installed on all graded slopes three (3) to one (1) and greater. A slope stability analysis or approved alternative shall be performed for permanent slopes graded steeper than two and a half (2.5) to one (1).
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-21: Code current through: Ord. 26-23, passed June 9, 2026).
Full Breakdown
5:1. Subsection C lists the triggers that require a GEC Permit or Associate GEC Permit, disturbing one acre or more, being part of a larger common plan that disturbs an acre or more, grading or constructing within an open drainage channel, constructing or substantially modifying a permanent control measure, or any site the Stormwater Enterprise Manager deems necessary. 601C3). 601C5–6). 603A–B). 602A).
Violations & Fines
Grading without a required GEC Permit, or grading that damages life, limb or property, lets the Stormwater Enterprise Manager declare the site a public health, safety and welfare nuisance after inspection, triggering abatement that can include a new or revised GEC Plan or Stormwater Management Plan (§7.4.602). Starting the final construction phase without an approved Permanent Control Management Plan can draw a stop-work order (§7.4.601C3). Refusing to allow an inspection can lead the City to obtain a Municipal Court warrant to enter and inspect (§7.4.603B). Absent a specific fine, the Code's general penalty of up to $2,500 and/or 189 days in jail applies (§1.1.201B).
Frequently Asked Questions
When do I need a Grading and Erosion Control Permit in Colorado Springs?
What slope standards apply to grading?
Who reviews Colorado Springs GEC permit applications?
Can the City inspect my grading site without my permission?
Do hillside properties need extra approvals for grading?
Sources & Official References
Other rules in Colorado Springs
Compare Colorado Springs to another location·View the Colorado environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.