Key Facts

Governing rule
RBC § 313 as adopted/amended by UDC § 7.4.801-.803
Plat requirement
FEMA base flood elevation data must be shown
Zone A trigger distance
Within 300 feet of mapped Zone A floodplain
Appeals body
Drainage Board hears Floodplain Administrator appeals
Variance standard
Public hearing; exceptional hardship required
Building-code penalty
Up to $500 fine, 90 days jail (RBC 101.8)

Summary

Colorado Springs applies Regional Building Code Section 313's floodplain rules through UDC § 7.4.802, requiring every subdivision plat to show FEMA-approved base flood elevation data and 100-year floodplain boundaries. Parcels within 300 feet of a mapped Zone A floodplain need a licensed engineer's floodplain certification, or plat-shown elevations, before the City approves the plat.

"RBC 313.18.5, Subdivision Proposals. 1. All proposed subdivisions shall be consistent with the need to minimize flood damage; 2. All proposed subdivisions shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize flood damage; 3. All proposed subdivisions shall have adequate drainage provided to reduce exposure to flood damage; and, 4. FEMA approved base flood elevation data and 100-year floodplain boundaries shall be provided and shown on the Subdivision Plat; 5. If a proposed subdivision is located within three hundred (300) feet of a zone A floodplain, FEMA approved base flood elevations and boundaries are required to be determined and shown on plat, or a floodplain certification letter by a professional engineer or architect licensed by the State of Colorado shall be provided..."

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-21: Code current through: Ord. 26-23, passed June 9, 2026).

Full Breakdown

802. 5 (Subdivision Proposals) to require that every proposed subdivision minimize flood damage, locate utilities to avoid flood damage, provide adequate drainage, and show FEMA-approved base flood elevation (BFE) data and 100-year floodplain boundaries on the Subdivision Plat. If the subdivision sits within 300 feet of a Zone A floodplain, the applicant must either show the FEMA BFE and boundaries on the plat or submit a floodplain certification letter, sealed by a Colorado-licensed professional engineer or architect, stating the property is reasonably safe from flooding.

B replaces the old Appeal Board with the Drainage Board, which hears appeals of the Floodplain Administrator's decisions after a public hearing where both the FPA and the applicant can comment. C rewrites the variance rules: variances cannot be issued inside a designated floodway if they would raise flood levels, must be the minimum relief necessary, and require the Drainage Board to find good cause, exceptional hardship, and no increased flood risk or public expense. Anyone who receives a variance to build below the base flood elevation must get written notice that flood insurance will cost more because of the lower floor. 803 disclaims City liability, warning that larger floods can and will occur even outside mapped hazard areas.

Violations & Fines

A plat that omits required BFE data or the Zone A certification simply won't be approved by the City. Because floodplain management is folded into the Regional Building Code, a structure built below the base flood elevation without an approved Drainage Board variance is enforced as a Building Code violation: RBC 101.8 makes any violation of the Building Code a misdemeanor punishable by a fine of up to $500, up to 90 days in jail, or both, with each day the illegal construction or use continues counted as a separate offense.

Frequently Asked Questions

Does a new subdivision in Colorado Springs need base flood elevation data?
Yes. UDC § 7.4.802.D requires every proposed subdivision to show FEMA-approved base flood elevation data and 100-year floodplain boundaries on the Subdivision Plat before the City will approve it.
Can I build below the base flood elevation in Colorado Springs?
Only with a Drainage Board variance granted after a public hearing, a finding of exceptional hardship, and no increase in flood levels. You must also receive written notice that flood insurance will cost more because of the lower floor elevation, per § 7.4.802.C.
What if my lot is near a Zone A floodplain?
If it's within 300 feet of a mapped Zone A floodplain, § 7.4.802.D requires either FEMA base flood elevation and boundary data on the plat, or a certification letter from a Colorado-licensed engineer or architect stating the property is reasonably safe from flooding.
Who decides floodplain appeals in Colorado Springs?
The Drainage Board, which replaced the old Appeal Board under § 7.4.802.B. It hears appeals of the Floodplain Administrator's decisions after giving the FPA, the applicant, and the public a chance to comment.

Sources & Official References

Other rules in Colorado Springs

All Colorado Springs rules

Compare Colorado Springs to another location·View the Colorado environmental rules overview

Get notified when Flood Elevation Requirements in Colorado Springs, CO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.