Maricopa, AZ Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Governing section
Maricopa City Code § 18.85.040(B), (D)
Design standard
Must follow city standard details and engineering policies
Overlay exception
MU-H Overlay District, see Chapter 18.75 MCC
Retention purpose
AZPDES compliance and limited discharge outlet capacity
Construction gate
No work until plans approved, fees paid, permit issued
Infraction fines
$100 first, $200 second, $500 further violations
Civil penalty
Up to $1,000 per day per violation

Summary

Before the city approves any new development, its storm drainage design must conform to Maricopa's engineering standards and carry an Engineering Division-approved grading and drainage plan under Maricopa City Code § 18.85.040(B). Subsection (D) treats on-site storm water retention as a core piece of the city's compliance with Arizona Pollutant Discharge Elimination System (AZPDES) rules, the state permit program governing construction-site erosion and sediment control.

B. Design. The design of sanitary sewer, storm drainage, and water system facilities shall conform to the city’s standard details and engineering policies and private utility company standards where these are separately provided. An approved grading and drainage plan by the engineering division is required prior to development approval. Specific exception to this standard may be approved for development in the MU-H Overlay District; see Chapter 18.75 MCC. ... D. Storm Water Retention Required. Storm water retention is an integral component of the city’s storm water management program and compliance with Arizona Pollutant Discharge Elimination System requirements. Due to limitations of discharge outlets, on-site retention is a high priority element for a successful program to minimize flooding and related property damage.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 26-10, passed April 21, 2026).

Full Breakdown

040(A)). 75 MCC. 020(D)). 040(D) explains why retention is mandatory rather than optional: on-site storm water retention is 'an integral component of the city's storm water management program and compliance with Arizona Pollutant Discharge Elimination System requirements,' and because the city's discharge outlets are limited, retention is treated as 'a high priority element' for preventing flooding and property damage. In practice, a developer's civil engineer submits grading, drainage and retention calculations to the Engineering Division as part of development plan review before any dirt moves, and the retention design has to satisfy AZPDES-driven expectations, not just hold volume.

Violations & Fines

Grading, drainage or retention work started without an approved plan and permit violates Chapter 18.85 and is enforced under Maricopa City Code § 18.190.060: a first infraction draws a fine up to $100, a second on the same property within a year up to $200, and each further violation up to $500, with repeat or willful violations chargeable as a misdemeanor carrying up to $1,000 and six months in county jail, or a civil penalty up to $1,000 per day the violation continues.

Frequently Asked Questions

Do I need an approved grading and drainage plan before building in Maricopa?
Yes. Maricopa City Code § 18.85.040(B) requires storm drainage design to conform to the city's standard details and engineering policies, and an approved grading and drainage plan from the Engineering Division is required before the city grants development approval. Construction permits for the drainage work also need city engineer review and approval under § 18.85.020(D) before any work starts.
Is there any exception to Maricopa's storm drainage design standard?
Yes, but it's narrow. Section 18.85.040(B) allows a specific exception for development inside the MU-H Overlay District, addressed separately in Chapter 18.75 MCC. Outside that overlay, every development citywide must meet the standard grading, drainage and retention requirements before the city will approve the project.
Why does Maricopa require on-site storm water retention?
Because the city's storm drain system has limited discharge outlets. Under § 18.85.040(D), on-site retention is treated as an integral part of the city's storm water management program and its compliance with Arizona Pollutant Discharge Elimination System (AZPDES) rules, and the code calls it 'a high priority element' for preventing flooding and property damage.
What happens if grading starts before the plan is approved?
The work is unauthorized under § 18.85.020(A), which bars construction of storm drainage facilities until plans are approved, fees are paid and permits issued. Violations are enforced under § 18.190.060: escalating infraction fines up to $500, a possible misdemeanor charge, or a civil penalty of up to $1,000 per day the violation continues.

Sources & Official References

Other rules in Maricopa

All Maricopa rules

Compare Maricopa to another location·View the Arizona environmental rules overview

Get notified when Erosion Control in Maricopa, AZ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.