Roseville, MN Environmental Rules: Erosion Control (2026)
Key Facts
- Plan reviewer
- City engineer
- Trigger area
- Land disturbance greater than 5,000 square feet
- Water resource trigger
- 50 cubic yards within 300 feet of a water resource
- Fine without permit
- Twice the required permit fee
- Corrective work deadline
- 48 hours after city notification
- Staff time charge
- Hourly rate times 1.9, paid within 30 days
- Escrow
- Amount set in the city fee schedule
Summary
Roseville requires an approved grading, erosion and sediment control plan before any land disturbance activity: more than 5,000 square feet, or 50 cubic yards of earthen material within 300 feet of a water resource. Work without a permit draws a stop work order and a fine of twice the permit fee under Roseville City Code § 803.04.
(a) Purpose. ... The purpose of this section is to regulate grading and to control or eliminate soil erosion and sedimentation resulting from construction activity within the city. ... No land shall be disturbed until the plan is approved by the city and conforms to the standards set forth in this section. ... Land disturbance activity means any activity, including clearing, grading, excavating, transporting and filling of land, greater than 5,000 square feet, or placement or grading of 50 cubic yards of earthen materials on a parcel of land located within 300 feet of a water resource. ... If no permit has been obtained, a stop work order shall be issued on the construction and a fine shall be issued in an amount equal to twice the required permit fee. ... The corrective work shall be completed by the permittee within 48 hours after notification by the city.
Official source re-checked November 3, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 2).
Full Breakdown
Section 803.04 applies to any person, entity, state agency or political subdivision proposing land disturbance activity in Roseville. Land disturbance activity means clearing, grading, excavating, transporting and filling of land greater than 5,000 square feet, or placement or grading of 50 cubic yards of earthen materials on a parcel within 300 feet of a water resource (any stream, channel, wetland, storm pond or lake in the city). Excluded are home gardens and home landscaping disturbing less than 500 square feet, small agricultural tilling, installation of fence, sign and utility poles, and emergency work to protect life, limb or property.
Every permittee for a building permit, subdivision approval or land disturbance permit must submit the plan to the city engineer, and no earth disturbing activity starts until the city approves it. Projects coordinated by the county or the state department of transportation need no permit, but the city must receive the plan and an estimated schedule. The plan must control stormwater leaving the site, stabilize exposed soils and stockpiles, protect storm sewers from sediment, debris and trash, control concrete truck washout and other waste, protect paved roads from mud, and remove sediment from streets at the end of each day. It must also include a project description, phasing, soils, critical erosion areas, stabilization methods and a maintenance inspection schedule.
Controls shown on the plan must be installed before the disturbance begins and stay in place until the city approves removal or issues a certificate of completion. The city requires an escrow, set in the city fee schedule, that covers completion of the grading and the inspection, installation and maintenance of the erosion controls. Whatever remains is returned after the certificate of completion. A permit does not replace permits required by other government agencies.
Violations & Fines
Starting without a permit brings a stop work order and a fine equal to twice the required permit fee, and a completed plan and application must be filed before work resumes. When controls are not maintained, the permittee gets a list of corrective work due within 48 hours. After that the city can issue a stop work order, do the work itself, fine twice the permit fee, charge staff time at the hourly rate times 1.9, draw on the escrow, or assess unpaid charges under Minn. Stat. § 429.101. Appeals go to the city manager.
Frequently Asked Questions
When do I need an erosion control plan in Roseville?
What projects are not land disturbance activity under Section 803.04?
How long do I have to fix an erosion control failure?
What happens to my escrow in Roseville?
Can I appeal a notice of violation under the erosion control rules?
Sources & Official References
Other rules in Roseville
Compare Roseville to another location·View the Minnesota environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Erosion Control in Nearby Cities
How other cities in this county handle erosion control.