Bossier City, LA Environmental Rules: Flood Zones (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

FEMA flood zone rules in Bossier City, LA, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.

Key Facts

Governing sections
Bossier City Code §§ 54-61 to 54-64, 54-97
Permit required
floodplain development permit (§ 54-63)
Floodplain administrator
city engineer (§ 54-81)
Elevation standard
1 ft above base flood elevation, residential (§ 54-92)
Penalty
up to $100 fine or 5 days jail, per day (§ 54-97)
Flood maps
FEMA FIRM panels + Red River Advisory BFE map (§ 54-62)

Summary

Bossier City requires a floodplain development permit for any construction, alteration or land-use change within its FEMA-mapped special flood hazard areas. Secs. 54-61 through 54-64 make the city's flood insurance rate maps controlling, and Sec. 54-97 backs the permit requirement with fines up to $100.00 and up to five days in jail per violation, with every day counted separately.

This chapter shall apply to all areas of special flood hazard within the jurisdiction of the city council. ... A floodplain development permit shall be required to ensure conformance with the provisions of this chapter. ... No structure or land shall hereafter be located, altered, or have its use changed without full compliance with the terms of this chapter and other applicable regulations. ... Violation of the provisions of this chapter by failure to comply with any of its requirements (including violations of conditions and safeguards established in connection with conditions) shall constitute a misdemeanor. Any person who violates this chapter or fails to comply with any of its requirements shall upon conviction thereof be fined not more than $100.00 or imprisoned for not more than five days, or both, for each violation. Each day the violation continues shall be deemed a new violation.

Full Breakdown

Chapter 54's floodplain-management ordinance, adopted under Ord. No. 143-2016, applies to all areas of special flood hazard within the city council's jurisdiction, per Sec. 54-61. Sec. 54-62 adopts FEMA's Flood Insurance Study for Bossier Parish and its accompanying flood insurance rate maps, including panels dated March 19, 2013 and September 26, 2008, as amended by revised panels adopted August 18, 2016, and it layers on the Red River Advisory Base Flood Elevation Map for Bossier Parish where that map imposes a stricter standard. Sec. 54-63 requires a floodplain development permit before any project can proceed to ensure it conforms with the chapter, and Sec.

54-64 backs that up with a blanket compliance rule: no structure or land can be located, altered, or have its use changed in a mapped flood hazard area without full compliance with the chapter and other applicable regulations. The city engineer serves as floodplain administrator under Sec. 54-81, reviewing every permit application to confirm the proposed building site, including manufactured-home placement, will be reasonably safe from flooding, and coordinating with FEMA and the state on watercourse alterations. Article V's technical standards, starting at Sec. 54-91, require new construction and substantial improvements to be anchored against flotation and built with flood-damage-resistant methods and materials, with residential structures elevated at least one foot above base flood elevation under Sec.

54-92. Sec. 54-97 makes noncompliance a misdemeanor: conviction carries a fine of not more than $100.00 or imprisonment of not more than five days, or both, for each violation, and every day the noncompliance continues is a separate, additional violation, on top of the violator's liability for the city's costs and expenses in the case.

Violations & Fines

Building, altering or changing the use of a structure within a mapped special flood hazard area without the Sec. 54-63 floodplain development permit, or without meeting Sec. 54-64's compliance standard, is a misdemeanor under Sec. 54-97. Conviction carries a fine of not more than $100.00 or imprisonment of not more than five days, or both, for each violation, with every additional day of noncompliance charged as a new offense, plus the violator's liability for the city's case costs.

Frequently Asked Questions

Do I need a permit to build in a flood zone in Bossier City?
Yes. Sec. 54-63 requires a floodplain development permit for any project within the city's mapped special flood hazard areas, and Sec. 54-64 bars locating, altering, or changing the use of a structure or land there without full compliance with the chapter.
How high above flood level does my house have to be built?
Sec. 54-92 requires new residential construction and substantial improvements to have the lowest floor, including any basement, elevated at least one foot above the base flood elevation, with mechanical and electrical equipment held to that same elevation standard under the floodplain administrator's review.
What's the penalty for building without a floodplain permit in Bossier City?
Sec. 54-97 makes noncompliance a misdemeanor punishable by a fine of not more than $100.00, imprisonment of not more than five days, or both, per violation, and treats each day the violation continues as a separate offense, on top of the violator's liability for case costs.

Sources & Official References

Other rules in Bossier City

All Bossier City rules

Compare Bossier City to another location·View the Louisiana environmental rules overview

Get notified when Flood Zones in Bossier City, LA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.