Bossier City, LA Environmental Rules: Stormwater Management (2026)
Key Facts
- Plan required
- Stormwater pollution prevention plan (SWP3)
- State permit
- LDEQ general permit for large construction
- Post-construction duty
- Permanent BMPs maintained in perpetuity
- Recording requirement
- Maintenance obligation recorded with parish clerk
- Enforcing agency
- Director of public utilities
Summary
Bossier City requires a stormwater pollution prevention plan for qualifying construction and requires permanent post-construction BMPs, such as ponds and swales, to keep managing runoff quality for the life of a development.
The city will require a stormwater pollution prevention plan (SWP3), which includes erosion and sediment control measures and materials handling procedures, to be submitted in addition to the construction plans and specifications as required by the Bossier City—Parish Unified Development Code. ... Land development/redevelopment that meets the requirements of this section shall address stormwater runoff quality through the use of permanent BMP's that shall be maintained in perpetuity. The following shall apply:(1)Structural control measures. Structural BMP's, such as pipes and inlets, ponds, swales, etc. located on private property shall be owned and operated by the owner(s) of the property on which the BMP is located, unless the city, in writing, agrees that a person other than the owner shall own or operate such BMP measure.
Full Breakdown
Chapter 114, Article IV requires any operator seeking approval for construction disturbing an acre or more to submit a stormwater pollution prevention plan (SWP3) alongside construction plans and specifications required by the Bossier City-Parish Unified Development Code. The SWP3 must be kept current and available on-site to federal, state and city inspectors from project initiation until final stabilization, and the responsible party must also obtain the state LDEQ general permit for large construction activities before beginning work. Once a project is built, Sec. 114-308 shifts the focus to permanent post-construction controls: structural stormwater BMPs such as pipes, inlets, ponds and swales on private property remain owned and operated by the property owner unless the city agrees in writing to take on that role.
As a condition of BMP approval, the owner must agree to maintain the facility to its design capacity, an obligation that gets memorialized on the subdivision plat, annexation plat or development agreement and recorded with the Bossier Parish Clerk of Court. Permanent BMPs subject to an inspection and maintenance agreement undergo ongoing inspection to confirm maintenance and repair needs are met. The director of public utilities administers the program and can issue notices of violation, order noncompliant activity stopped, and levy escalating per-day fines for willful or negligent violations.
Violations & Fines
A willful or negligent violation carries a director-assessed fine starting at $500.00 per day for a first offense, $1,000.00 per day for a second and $1,500.00 per day for a third; the city may also bill the responsible owner or operator for its own surveillance, sampling and remediation costs tied to the noncompliant site.
Frequently Asked Questions
Does Bossier City require a stormwater plan for new construction?
Who maintains stormwater ponds after a project is built?
What happens if a stormwater BMP is not maintained?
Sources & Official References
Other rules in Bossier City
Compare Bossier City to another location·View the Louisiana environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.