Casa Grande, AZ Environmental Rules: Flood Zones (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

FEMA flood zone rules in Casa Grande, AZ, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.

Key Facts

Permit required
SFHA development permit before any construction begins
Enforcing agency
Floodplain administrator, City of Casa Grande
Penalty
Class 2 misdemeanor; each day a separate offense
Review path
Floodplain board reviews unresolved violations within 30 days
Zone reference
SFHAs established under Section 15.40.580

Summary

The City of Casa Grande prohibits any development inside a special flood hazard area (SFHA) unless a SFHA development permit is first obtained from the floodplain administrator under Casa Grande Municipal Code § 15.40.730. The permit must be secured before construction begins, including manufactured home placement, and covers any SFHA established under Section 15.40.580. Violating the permit requirement is a Class 2 misdemeanor.

A. It is unlawful for any person to engage in any development within a SFHA without securing a SFHA development permit. Any violation of this section shall be subject to prosecution as a Class 2 misdemeanor in accordance with subsection 15.40.705.B. B. A SFHA development permit shall be obtained before construction or development begins, including placement of manufactured homes within any special flood hazard area established in Section 15.40.580.

Full Breakdown

The City of Casa Grande designates special flood hazard areas (SFHAs) under Section 15.40.580 of the Municipal Code, and Section 15.40.730 makes it unlawful to engage in any development within an SFHA without first securing a SFHA development permit from the floodplain administrator. The permit must be obtained before construction or development begins, including placement of manufactured homes. Applications go on forms furnished by the floodplain administrator and must show, at minimum: the proposed elevation of the lowest floor in relation to mean sea level (and, in Zone AO, the existing highest adjacent natural grade); the elevation to which any nonresidential structure will be floodproofed; engineer or architect certification that floodproofing methods meet the chapter's criteria; base flood elevation data; and a description of any watercourse alteration or relocation.

Design procedures and criteria must follow those prepared and published by the City of Casa Grande. If the floodplain administrator cannot resolve a violation through standard enforcement, Section 15.40.710 requires a report to the floodplain board, which within thirty days must either order abatement, refer the matter to the floodplain review board for a variance determination under Article VII, or order the property owner to supply additional information. The board can also, where applicable, ask FEMA to deny flood insurance on a noncompliant property under Section 1316 of the National Flood Insurance Act. Violating the permit requirement itself is a Class 2 misdemeanor under Section 15.40.705.B, with each day of continuing violation treated as a separate offense.

Violations & Fines

Developing in an SFHA without a permit is a Class 2 misdemeanor under Section 15.40.705.B, and Section 15.40.730.A applies the same penalty to any violation of the permit requirement, with each day of continued violation charged as a separate offense. Unresolved violations go to the floodplain board, which can order abatement, refer the case to the floodplain review board for a variance ruling, or, per Section 15.40.710.D, ask FEMA to deny flood insurance coverage on the property.

Frequently Asked Questions

Do I need a permit to build in a Casa Grande flood zone?
Yes. Casa Grande Municipal Code § 15.40.730 makes it unlawful to engage in any development, including placing a manufactured home, within a special flood hazard area without first obtaining a SFHA development permit from the floodplain administrator. The permit application must include elevation data, floodproofing certification where applicable, and a description of any watercourse changes before the City approves construction.
What happens if I build in a flood zone without a permit?
Building without a required SFHA development permit is a Class 2 misdemeanor under Section 15.40.705.B, and each day the violation continues counts as a separate offense. The floodplain administrator first tries standard enforcement; if that fails, the case goes to the floodplain board, which can order abatement or send the matter to the floodplain review board for a variance decision.
Who decides where Casa Grande's flood zones are?
Special flood hazard areas are established under Casa Grande Municipal Code Section 15.40.580, and the floodplain administrator applies those boundaries when reviewing SFHA development permit applications under Section 15.40.730. Design procedures and criteria used to evaluate development must follow standards the City of Casa Grande has prepared and published.

Sources & Official References

Other rules in Casa Grande

All Casa Grande rules

Compare Casa Grande to another location·View the Arizona environmental rules overview

Get notified when Flood Zones in Casa Grande, AZ changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.