Jefferson County, WI Environmental Rules: Stormwater Management (2026)
Key Facts
- Who must comply
- Subdividers of new plats
- Facilities required
- Curbs, catchbasins, storm sewers, ditches, channels
- Design standard
- Set by the county engineer
- Large sewer cost
- Prorated over 24-inch diameter
- Approval gate
- No construction before plat approval
Summary
Jefferson County Code § 16-35(e) requires anyone platting a new subdivision to build stormwater drainage facilities, which may include curbs and gutters, catchbasins, storm sewers, road ditches and open channels, sized and graded to the county engineer's specifications before development proceeds.
(e)Stormwater drainage facilities. The subdivider shall construct stormwater drainage facilities, which may include curbs and gutters, catchbasins and inlets, storm sewers, road ditches and open channels, as may be required.(1)All such facilities are to be of adequate size and grade to hydraulically accommodate maximum potential volumes of flow, the type of facility required, the design criteria and the sizes and grades to be determined by the engineer. Storm drainage facilities shall be so designed as to present no hazard to life or property; and the size, type, and installation of all stormwater drains and sewers proposed to be constructed shall be in accordance with the plans and standard specifications approved by the engineer.(2)If greater than 24-inch diameter sewers are required to handle the contemplated flows, the cost of such larger sewers shall be prorated in proportion to the ratio which the total area of the proposed plat is to the total drainage area to be served by such larger sewer, and the excess cost either borne by the county board of supervisors or assessed against the total tributary drainage area.
Full Breakdown
Section 16-35, part of the subdivision-platting article in Chapter 16, requires subdividers to install the "required improvements" the county specifies before development proceeds: grading (§ 16-35(b)), street surfacing (§ 16-35(c)) and, for stormwater specifically, § 16-35(e)'s drainage facilities. " If the required stormwater sewers exceed 24 inches in diameter to handle the contemplated flow, § 16-35(e)(2) prorates the extra cost between the subdivider and either the county board or the broader tributary drainage area, so a developer is not always responsible for the full cost of oversized drainage infrastructure.
The related design-standards section, § 16-34(i)(2), separately requires a subdivision traversed by a watercourse or drainageway to include an adequate drainage easement approved by the engineer, and directs that "stormwater drainage shall be maintained by landscaped open channels of adequate size and grade" where necessary. Because § 16-36(a) bars any construction or installation of improvements until the preliminary plat is approved and the engineer authorizes work in writing, a subdivider cannot install stormwater facilities, or receive a building permit under § 16-36(b), ahead of that approval. Enforcement runs through the county's plat-approval process rather than a standalone stormwater permit or fine.
Violations & Fines
There is no separate stormwater fine in this article; the county controls compliance by withholding plat and construction approval. Under § 16-36, no construction or installation of subdivision improvements, including stormwater facilities, may begin until the preliminary plat is approved and the engineer authorizes work in writing, and no building permit issues until the required improvements are met.
Frequently Asked Questions
Does Jefferson County require stormwater drainage for new subdivisions?
Who pays for oversized stormwater sewers in a Jefferson County subdivision?
Can I start grading before my stormwater plan is approved?
Does this stormwater rule apply outside new subdivisions?
Sources & Official References
Other rules in Jefferson County
Compare Jefferson County to another location·View the Wisconsin environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.