Key Facts
- Trigger
- 100+ required vehicle parking spaces
- Level 2 ratio
- 1 EVCS per 25 spaces
- Level 3 ratio
- 1 EVCS per 100 spaces
- Applies to
- non-residential and For-Rent projects
- Added by
- Ord. No. 864, Oct. 2023
- Fine
- $250-$1,000 per offense, per day
Summary
Alpharetta requires electric vehicle charging stations at large non-residential and for-rent residential developments. Any project needing 100 or more vehicle parking spaces must install one Level 2 EVCS for every 25 required spaces, or one Level 3 EVCS for every 100 required spaces, under the Unified Development Code.
All non-residential and Dwelling, 'For-Rent' developments requiring 100 or more vehicle parking spaces shall provide electric vehicle charging stations. One (1) Level 2 EVCS for every 25 required vehicle parking spaces or one (1) Level 3 EVCS for every 100 required vehicle parking spaces shall be required.
Full Breakdown
UDC § 2.5.7 requires electric vehicle charging stations at every non-residential development and every 'For-Rent' dwelling development that needs 100 or more vehicle parking spaces under the Code's parking tables. The ratio is set at one Level 2 EVCS for every 25 required vehicle parking spaces, or, as an alternative, one Level 3 (fast-charging) EVCS for every 100 required spaces; a developer may mix the two standards to meet the overall obligation. The requirement was added to the parking chapter by Ord. No. 864 in October 2023 and sits within Section 2.5, Parking and Loading, alongside the City's other design standards for lot size, bicycle parking, and loading spaces.
Because the trigger is keyed to the required parking count rather than gross floor area, a project can cross the 100-space threshold either through its base use table calculation or through any shared-parking reduction the Director approves under § 2.5.2. Smaller developments, including single-family and townhome projects that fall under the 100-space threshold, are not required to install EVCS under this section, though nothing in the Code prevents voluntary installation. Site plans showing EVCS locations, conduit, and required signage are reviewed by the Director of Community Development as part of development permit approval under UDC Article V before a certificate of occupancy issues.
Violations & Fines
Failing to install the required Level 2 or Level 3 charging stations is enforced the same as any other Unified Development Code parking violation: under § 5.9.2 the Director of Community Development can withhold or revoke a certificate of occupancy and, upon conviction, a violator faces a fine of $250.00 to $1,000.00 per offense, with each day of noncompliance counted as a separate offense.
Frequently Asked Questions
Which Alpharetta developments must install EV charging stations?
How many EV charging stations does Alpharetta require?
Do single-family homes need an EV charging station under this rule?
Sources & Official References
Other rules in Alpharetta
Compare Alpharetta to another location·View the Georgia parking rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
EV Charging in Nearby Cities
How other cities in Fulton County handle ev charging.