Skip to main content
CityRuleLookup

San Ramon, CA Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing state law
Gov't Code § 65850.7
HOA approval condition
Prohibited under Civil Code § 4080
Wiring standard
California Electrical Code Article 625
Submittal method
Electronic filing and e-signatures accepted

Summary

San Ramon runs a separate expedited, streamlined permitting track for electric vehicle charging stations under Government Code § 65850.7. The building official adopts a checklist drawing on the state's Plug-In Electric Vehicle Infrastructure Permitting Checklist, and a complete application matching it must be approved and permits issued promptly.

Consistent with Government Code Section 65850.7, the building official shall implement an expedited, streamlined permitting process for electric vehicle charging stations, and adopt a checklist of all requirements with which electric vehicle charging stations shall comply with in order to be eligible for expedited review. The expedited, streamlined permitting process and checklist may refer to the recommendations contained in the most current version of the "Plug-In Electric Vehicle Infrastructure Permitting Checklist" of the "Zero-Emission Vehicles in California: Community Readiness Guidebook" as published by the governor's office of planning and research. The city's adopted checklist will be published on the city's website.

Full Breakdown

Division C9, Chapter I of the San Ramon Municipal Code creates its own expedited process for electric vehicle charging stations, separate from the rooftop solar chapter. 7 and to adopt a checklist that may draw on the 'Plug-In Electric Vehicle Infrastructure Permitting Checklist' from the state's Zero-Emission Vehicles in California guidebook; that adopted checklist is published on the city's website. Under § C9-4, an applicant must first verify the installation will not create a specific, adverse impact to public health, safety or building occupants, covering electrical capacity and loads, wiring, bonding, overcurrent protection and the building infrastructure around the charging equipment.

Once an application satisfies the city's checklist, the building official must promptly approve it and issue the permits; approval alone does not authorize energizing the station until the city grants final sign-off. Electronic submittal and electronic signatures must be accepted in place of paper filings and wet signatures. Section C9-5 lets the building official require a use permit only on substantial evidence of a specific, adverse health-or-safety impact, but bars conditioning any approval on sign-off by a homeowners' association under Civil Code § 4080. Section C9-6 layers in technical standards: installations must meet California Electrical Code Article 625, be counted as a continuous load in electrical service calculations, and satisfy building or residential code anchorage rules for the mounting method used.

Violations & Fines

An incomplete application draws a written correction notice listing every deficiency, not a fine, so the applicant can resubmit for expedited review. Energizing a charging station before the city's final approval, or installing one without any permit at all, is treated as unpermitted electrical work under the building code, which can bring a stop-work order and required retroactive permitting.

Frequently Asked Questions

Does my HOA have to approve my EV charger before San Ramon issues a permit?
No. Section C9-5 bars the building official from conditioning any electric vehicle charging station permit on approval by a homeowners' association, as defined in Civil Code § 4080, so an HOA review cannot hold up the city's expedited permitting process.
Can I energize my charging station as soon as San Ramon approves my permit?
Not automatically. Section C9-4 states that approval of the application and issuance of permits does not by itself authorize an applicant to energize or use the charging station; final city approval, typically confirmed at inspection, is still required first.
What wiring standard applies to my home EV charger?
Installation and its wiring, bonding, disconnects and overcurrent protection must meet California Electrical Code Article 625 under § C9-6, and the charging load must be folded into your home's electrical service load calculations as a continuous load, not an occasional one.

Sources & Official References

Other rules in San Ramon

All San Ramon rules

California rules heatmap·Compare San Ramon to another location·View the California parking rules overview

Get notified when EV Charging in San Ramon, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

EV Charging in Nearby Cities

How other cities in Contra Costa County handle ev charging.

Richmond, CA
Light Restrictions
Brentwood, CA
Some Restrictions
Antioch, CA
Some Restrictions