Inglewood, CA Solar Energy: Panel Permits (2026)
Key Facts
- Water-heating systems
- Need accredited listing-agency certification
- Electricity-producing systems
- Must meet CA Electrical Code, UL standards
- Excavation notice
- Required before installing any ground rod
- System size cap
- 10 kW AC or 30 kW thermal
- Height limit
- Cannot exceed zone's max legal building height
- Adopted by
- Ordinance 21-04, effective January 19, 2021
Summary
Inglewood Municipal Code Section 11-169 sets the technical standards every rooftop solar installation must satisfy before the Building Official issues a permit: State Fire, Plumbing, Electrical and Public Utilities Commission safety compliance, accredited listing-agency certification for water-heating systems, and a mandatory call to the regional underground-utility notification center before any ground rod is installed.
(1) All solar energy systems shall meet applicable health and safety standards and requirements imposed by the State of California and of the City of Inglewood, including the local Fire Department. (2) Solar energy systems for heating water in single-family residences and for heating water in commercial or swimming pool applications shall be certified by an accredited listing agency as defined by the California Plumbing and Mechanical Codes. (3) Solar energy systems for producing electricity shall meet all applicable safety and performance standards established by the California Electrical Code, the Institute of Electrical and Electronics Engineers, and accredited testing laboratories such as Underwriters Laboratories, and, where applicable, rules of the Public Utilities Commission regarding safety and reliability. (4) No later than January 1, 2021, an application to install a solar energy system shall include a reference to the requirement to notify the appropriate regional notification center of an excavator's intent to excavate...before conducting an excavation, including, but not limited to, installing a ground rod.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: rev 4954608; v8 updated 2026-05-19).
Full Breakdown
Section 11-169, adopted by Ordinance 21-04 on January 19, 2021, lists the substantive requirements a rooftop solar system must meet in Inglewood, separate from the expedited application paperwork covered elsewhere in Article 17. Every system must meet the health and safety standards the State of California and the City, including the local Fire Department, impose. A system used to heat water in a single-family residence, or to heat water for commercial or swimming-pool use, must carry certification from an accredited listing agency as defined by the California Plumbing and Mechanical Codes.
A system built to produce electricity must meet the safety and performance standards of the California Electrical Code, the Institute of Electrical and Electronics Engineers, accredited testing laboratories such as Underwriters Laboratories, and, where applicable, the Public Utilities Commission's safety and reliability rules. 1, Division 5, Title 1 of the Government Code before any excavation, including sinking a ground rod for the electrical system; the city disclaims liability for a permit holder's failure to make that call. These requirements apply on top of, not instead of, Section 11-170's checklist and fee process and Section 11-168's definitions, which cap an eligible small residential system at 10 kilowatts AC or 30 kilowatts thermal, limit it to single- or duplex-family dwellings and their accessory structures, and cap panel height at the zone's maximum legal building height.
Violations & Fines
Installing a water-heating solar system without accredited listing-agency certification, or an electricity-producing system that fails to meet Electrical Code and testing-laboratory standards, is a code violation the Building Official can flag on the single required inspection and refuse to sign off. Skipping the regional notification-center call before setting a ground rod exposes the installer, not the city, to liability for any resulting utility strike or excavation damage.
Frequently Asked Questions
Does Inglewood require special certification for solar water heaters?
What standards apply to solar panels that generate electricity in Inglewood?
Do I need to call before installing a solar ground rod in Inglewood?
Sources & Official References
Other rules in Inglewood
California rules heatmap·Compare Inglewood to another location·View the California solar energy overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.