Skip to main content
CityRuleLookup

Atlanta, GA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Permit fee
$360 minimum
Exemption
non-structural repairs only
Shingle layers
3 max after repair
Unpermitted work penalty
double fee, up to $1,000
Historic districts
exemption does not apply

Summary

Replacing a roof in Atlanta requires a building permit with a $360 minimum fee; only non-structural repairs to existing shingles on houses and duplexes are permit-exempt, and only if three or fewer layers remain.

The following permit exemptions shall only apply to existing single-family, two-family or duplex residential structures or for existing accessory structures for such properties and without regard to cost: i. Non-structural re-roofing repairs excluding truss repairs or shingle replacement provided that upon replacement no more than three layers of shingles remain;

Full Breakdown

The Atlanta Building Code, adopted as Appendix A to the City Code, requires a building permit for reroofing work at a $360.00 minimum fee under Section 104.2(m)(h). Section 103.4(a)(i) exempts only non-structural re-roofing repairs on existing one- and two-family or duplex homes and their accessory structures: truss repairs and any job leaving more than three layers of shingles still require a permit. Doing roofing work without a permit doubles the normal fee, capped at $1,000.00, and can bring a stop-work order and citation from the Office of Buildings. Properties in a Chapter 20 historic or landmark district lose the exemption entirely and need a certificate of appropriateness plus a permit for any exterior repair over $2,500.00.

Violations & Fines

Reroofing without a permit doubles the normal permit fee (capped at $1,000) and can trigger a stop-work order and citation from the Office of Buildings under Section 104.2(d).

Frequently Asked Questions

Do I need a permit to replace my roof in Atlanta?
Yes. A full reroof requires a building permit with a $360 minimum fee under Atlanta Building Code § 104.2(m)(h); only minor non-structural shingle repairs on houses and duplexes are exempt.
How many layers of shingles can I have before a permit is required?
Atlanta's repair-work exemption only applies if no more than three layers of shingles remain after the work: beyond that, or with truss repairs, a building permit is required.

Sources & Official References

Other rules in Atlanta

All Atlanta rules

Compare Atlanta to another location·View the Georgia building safety overview

Get notified when Building Permits in Atlanta, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in Fulton County handle building permits.

Sandy Springs, GA
Some Restrictions
Roswell, GA
Some Restrictions