Casper, WY Building Safety: Building Permits (2026)
Key Facts
- Permit exemption
- One-story detached accessory building under 120 sq ft
- Unplatted-land condition
- Streets/alleys deeded and accepted before permit
- Site plan requirement
- Required unless waived by city engineer, § 15.04.020
- Fees
- Set by city council resolution, § 15.04.100
- Penalty
- Misdemeanor plus possible contractor license action
Summary
Casper requires a building permit for virtually every structure. Section 15.02.040 blocks any permit on unplatted land until streets and alleys are dedicated and accepted by the city council, and Section 15.02.050 exempts only one narrow category: a one-story detached accessory building under one hundred twenty square feet.
No building permit shall be issued for a building on any unplatted property in the city except upon written application with complete plans showing in detail all proper approaches to street, alleys, and upon deeding such streets and alleys and approaches to the city, and after acceptance of streets, alleys and approaches, by vote of the city council. ... One-story detached accessory building under one hundred twenty square feet in area as measured at the maximum exterior wall dimension.
Full Breakdown
The city's adopted 2024 International Residential Code, amended at Section 15.02.040, bars a building permit on any unplatted property except upon written application with complete plans showing in detail all proper approaches to street and alleys, and only after the streets, alleys and approaches are deeded to the city and accepted by a vote of the city council. Section 15.02.050 then lists the only work the city exempts from that permit requirement: a one-story detached accessory building under one hundred twenty square feet in area, measured at the maximum exterior wall dimension.
Everything larger, including the main dwelling itself, needs a permit. The parallel commercial chapter, Section 15.04.020, adds that no building permit issues without an approved site plan under the zoning title, unless the city engineer waives that requirement in writing because the necessary site improvements already exist, and that financial surety for any required off-site or on-site drainage improvements must be posted under Section 16.28.070 before the permit is issued. Chapter 15.08, the dedicated building-permits chapter, further ties issuance to completed off-site improvements in the subdivision, with Section 15.08.030 allowing a foundation permit once off-site work has begun and a full building permit only once all-weather roadways, water and sewer mains are accepted and connection fees are paid.
Community Development and the city engineer jointly administer these permit conditions, and fees for both foundation and building permits are set by city council resolution under Section 15.04.100.
Violations & Fines
Building or adding to a structure above the 120-square-foot detached-accessory exemption without a permit, or on unplatted land before streets and utilities are accepted, violates Section 15.02.040 and Chapter 15.08. Any person violating the building-permit chapter is guilty of a misdemeanor punishable under Chapter 1.28 of the Casper Municipal Code, and a licensed contractor who violates the chapter risks suspension or revocation of that license under Section 15.08.050.
Frequently Asked Questions
What size accessory building can I build in Casper without a permit?
Can I get a building permit on unplatted land in Casper?
Does Casper require a site plan before issuing a building permit?
Sources & Official References
Other rules in Casper
Compare Casper to another location·View the Wyoming building safety overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.