Casper, WY Building Safety: Electrical Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Code adopted
NFPA 70-2023 National Electrical Code, § 15.28.010
Permit required
§ 15.28.050, all wiring/fixtures/equipment work
Late-permit penalty
Permit fee doubled if work starts first
Permit expiration
180 days to start, 1 year to complete
Owner private-work exception
Own residence, own hands, § 15.28.090
Penalty
Misdemeanor, § 15.28.160 / Chapter 1.28

Summary

Casper adopted the NFPA 70-2023 National Electrical Code and requires a permit for nearly all wiring work. Section 15.28.050 requires anyone doing electrical wiring, fixture or utilization equipment work to procure a permit from the city electrical inspector, and makes it unlawful to interfere with wiring without one.

A.All companies, firms, partnerships, corporations, individuals or entities who do electrical wiring for electric signs, electric fixtures, appliances or utilization equipment installed in or on any buildings or property, or removed from the interior or exterior on any building or property (except as allowed by Section 15.28.080(A), exceptions 2, 3 and 4), shall procure a permit from the city electrical inspector. ... It is unlawful for all contractors, workmen or individuals to in any way interfere with any electric wiring, except as allowed by Section 15.28.080(A)(2),(3) and (4), in or on any building or property, in any manner whatsoever, without first having secured a permit therefore. Failure to obtain a permit prior to the start of the work shall result in the applicable permit fees being doubled.

Full Breakdown

Section 15.28.010 adopts the NFPA 70-2023 Edition of the National Electrical Code for the city, administered by the city electrical inspector under Section 15.28.030. Section 15.28.050, the chapter's permit-required provision, requires all companies, firms, partnerships, corporations, individuals or entities doing electrical wiring for signs, fixtures, appliances or utilization equipment installed in or removed from a building or property to procure a permit from the city electrical inspector, with permits issued only to a contractor holding a valid, unexpired license of the proper category or, for private work, to an individual under Section 15.28.090.

It is unlawful to interfere with electric wiring without first securing a permit; failing to obtain one before starting work doubles the applicable permit fee. Permits expire if the authorized work is not commenced within one hundred eighty days and completed within one year, and a lapsed permit can be renewed within thirty days for half the original fee. Section 15.28.090 lets an owner pull a private-work permit for wiring in or about their own residential property if it is not a public place, place of business, or place of worship, and all the work is done with the owner's own hands; routine maintenance needs no permit, but any extension or modification of existing circuitry does.

Fees are calculated from a valuation of openings, motors and fixtures against the adopted building-permit fee schedule under Section 15.28.060 and set by city council resolution.

Violations & Fines

Doing electrical wiring covered by Section 15.28.050 without a permit is unlawful and doubles the permit fee once one is obtained; continuing without a license or permit, or violating any provision of Chapter 15.28, is a misdemeanor under Section 15.28.160, punishable per Chapter 1.28 of the Casper Municipal Code. The electrical inspector may also suspend or revoke a permit issued in error or on incorrect information.

Frequently Asked Questions

Do I need a permit to do my own home wiring in Casper?
Yes, unless you qualify for the private-work exception in Section 15.28.090: the property must be your own residence, not a public place or business, and you must do all the work yourself. Otherwise Section 15.28.050 requires a licensed contractor to pull the permit.
What happens if I start electrical work before getting a permit?
Section 15.28.050(B) doubles the applicable permit fee when a permit is not obtained before work starts, in addition to the misdemeanor penalty under Section 15.28.160 for violating the electrical code chapter. Casper enforces this through the city electrical inspector, who also has authority to disconnect unsafe or unpermitted wiring found in the field.
How long does a Casper electrical permit last?
It expires and becomes void if the authorized work is not commenced within one hundred eighty days or not completed within one year from the permit date, per Section 15.28.050(B). A renewal permit is available at half the original fee if requested within thirty days of expiration.

Sources & Official References

Other rules in Casper

All Casper rules

Compare Casper to another location·View the Wyoming building safety overview

Get notified when Electrical Permits in Casper, WY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.