Parma, OH Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Enforcing office
Building Commissioner, Division of Buildings
First-offense penalty
$100 for unpermitted work
Repeat-offense penalty
$300 second, $500 third offense
Permit posting
Displayed through 5 days after final inspection
Permit validity
Void after 1 year or 3-month pause
Renewal limit
One 6-month extension allowed

Summary

Parma requires a permit from the Building Commissioner before erecting, altering, repairing or removing any wall, building, structure, heating and ventilating apparatus, gas fitting, electrical work, house drainage or plumbing. Skipping the permit triggers escalating penalties: $100 for a first offense, $300 for a second, and $500 for a third, on top of the permit fee itself.

(a) Before the erection, construction, installation, enlargement, alteration, repair or removal of any wall or of any building, structure, heating and ventilating apparatus, gas fitting, electrical work, house drainage, plumbing or any part thereof, in the City, a permit therefor shall first be obtained by the owner or his or her agent or the architect from the Building Commissioner. No person shall commence or continue any such work unless a permit has first been obtained. Notwithstanding Section 1501.99, if any of the aforementioned construction shall be commenced without the taking out of all the necessary permits, a penalty in the amount of one hundred dollars ($100.00) for the first offense, three hundred dollars ($300.00) for the second offense, and five hundred dollars ($500.00) for the third offense shall be paid and should be assessed as part of the permit fee, and all work shall be stopped until such time as such fee or fees have been paid and permits secured, all to the satisfaction of the Commissioner.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-30: Local legislation current to August 3, 2026 | State legislation current to June 25, 2025).

Full Breakdown

15(a), the owner, agent or architect must obtain a permit from the Building Commissioner before any erection, construction, installation, enlargement, alteration, repair or removal of a wall, building, structure, heating and ventilating apparatus, gas fitting, electrical work, house drainage or plumbing anywhere in the City. No person may commence or continue such work without the permit in hand. 15(b) requires the permit itself to be posted on the front of the structure, or in an adequately observable location from the street, from before work starts through five days after final inspection.

18 exempts minor interior or exterior repairs that do not interfere with construction, and repairs or partitioning that involve no change to supporting walls, stairways, elevators, electrical work, plumbing, heating, air conditioning, ventilation or occupancy. 20. 19. 17.

Violations & Fines

Starting work before the permit is issued costs $100 for a first offense, $300 for a second and $500 for a third under Section 1501.15(a), assessed on top of the permit fee, with all work halted until the fees are paid and the permit secured to the Building Commissioner's satisfaction. Owner-occupied one-family homes get a one-time waiver of the $100 late fee. A lapsed, unrenewed permit under Section 1501.19 draws the same escalating fines if work resumes without renewal.

Frequently Asked Questions

Do I need a permit to repair my roof or replace a fixture in Parma?
Only if the work changes a supporting wall, structural member, stairway, elevator, electrical system, plumbing, heating or air conditioning equipment, ventilation, or occupancy. Section 1501.18 exempts minor interior or exterior repairs that don't interfere with the building's construction, but anything touching those systems needs a permit from the Building Commissioner first.
What happens if I start construction without a permit in Parma?
You owe an escalating penalty under Section 1501.15(a): $100 for a first offense, $300 for a second, $500 for a third, on top of the regular permit fee, and every bit of work stops until you pay and get the permit. Owner-occupied one-family homes get one penalty waiver.
How long is a Parma building permit good for?
A year from issuance, per Section 1501.19. If work stops for three months or the year runs out, the permit becomes void, and you must apply to renew it, with the renewal good for only six more months from reissuance.

Sources & Official References

Other rules in Parma

All Parma rules

Compare Parma to another location·View the Ohio building safety overview

Get notified when Building Permits in Parma, OH changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.