Shoreline, WA Building Safety: Building Permits (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Codes adopted
IBC, IRC and related International codes
Permit-exempt work
Low platforms, re-roofing, window swaps
Fee refund
Up to 80% if unstarted, within 180 days
Appeals go to
City Hearing Examiner, not a board
Enforcement
Civil infraction or misdemeanor up to $1,000

Summary

Shoreline requires a building permit for construction, alteration, or repair work under the International Building Code and International Residential Code the city adopted in SMC § 15.05.010, except for the narrow list of exempt work the city carved out in SMC § 15.05.030, including small platforms and driveways under 30 inches high, re-roofing without structural changes, and window replacement that keeps egress openings the same size.

§ 15.05.030. International Building Code amendments. A. Section 105.2, Work exempt from permit. ... ... 2. Section 105.2(6) is amended to read as follows: 6. Platforms, sidewalks and drive-ways not more than 30 inches (762 mm) above grade and not over any basement or story below and which are not part of an accessible route. 3. Section 105.2(14) is added to read as follows: 14. Re-roofing of existing buildings where there are no structural elements being revised or replaced including the roof diaphragm. 4. Section 105.2(15) is added to read as follows: 15. Replacement of windows where there are no structural elements being revised and emergency escape and rescue openings are not reduced in size.

Full Breakdown

The City of Shoreline, Washington adopts the International Building Code, International Residential Code, and related International codes by reference in SMC § 15.05.010, an adoption that covers permits for construction, alteration, removal, demolition, equipment, use and occupancy, location and maintenance of buildings, premises and structures. Because the IBC's default permit trigger is broad, the Planning and Community Development Department administers permitting through the city's own amendments to Section 105.2, Work Exempt from Permit, in SMC § 15.05.030(A). Those amendments narrow, rather than expand, the exemption list: platforms, sidewalks and driveways stay exempt only if they sit no more than 30 inches above grade and are not part of an accessible route; re-roofing is exempt only when no structural elements, including the roof diaphragm, are revised or replaced; and window replacement is exempt only when no structural elements change and the emergency escape and rescue opening size is not reduced.

Everything outside that list, additions, new construction, structural repairs, and larger accessory buildings, needs a permit before work starts. SMC § 15.05.020(A) routes every permit fee through the fee schedule adopted under Chapter 3.01 SMC, and lets the city manager refund up to 80 percent of a paid permit fee if no work has begun, or the full fee if it was collected in error, on a written application filed within 180 days. Under SMC § 15.05.020(B), any code reference to 'building official' or 'code official' means the city manager or a designee, and any reference to 'board of appeals' means the Hearing Examiner, so appeals of a permit denial or a stop-work order go to the Hearing Examiner rather than a separate board.

Violations & Fines

Building without a required permit is a code violation enforced under SMC § 20.30.770: the Director can issue a Class 1 civil infraction under Chapter 7.80 RCW, and willful violations are misdemeanors punishable by a fine up to $1,000 and up to 90 days in jail, with each week of continued violation a separate offense. Unpaid civil penalties under a notice and order start at $500 and double every 14 days.

Frequently Asked Questions

Does Shoreline require a permit to replace my roof?
Not if you are re-roofing without touching any structural elements, including the roof diaphragm. SMC § 15.05.030(A) added that exemption to Section 105.2 of the International Building Code. If the re-roof involves structural repair or replacement, a standard building permit is required before work starts.
Can I get a refund if I cancel my Shoreline building permit?
Yes. Under SMC § 15.05.020(A), the city manager or designee may refund up to 80 percent of the permit fee if no work has been done, or the full fee if it was collected in error, provided you file a written request within 180 days of payment.
Who enforces Shoreline's building permit rules?
The city manager or a designee, referred to in the adopted codes as the 'building official,' administers permits under SMC § 15.05.020(B). Appeals of permit decisions go to the city's Hearing Examiner rather than a separate board of appeals.

Sources & Official References

Other rules in Shoreline

All Shoreline rules

Compare Shoreline to another location·View the Washington building safety overview

Get notified when Building Permits in Shoreline, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Building Permits in Nearby Cities

How other cities in King County handle building permits.

Renton, WA
Some Restrictions
Seattle, WA
Some Restrictions
Kent, WA
Some Restrictions
Auburn, WA
Some Restrictions
Bellevue, WA
Some Restrictions
Federal Way, WA
Some Restrictions